SAMAN ENERGY. Company Profile. An introduction to the SAMAN ENERGY. 2012. Switchgear and Automation References. Contents. It all began in 2000. 03. Organizational chart. 04. Our Strategy. 05. What Can We Do. 06. Where We Are. 07. Our Services. 08. In Hand Projects. 11.
E N D
SAMAN ENERGY Company Profile An introduction to the SAMAN ENERGY 2012 Switchgear and Automation References
Contents It all began in 2000 03 Organizational chart 04 Our Strategy 05 What Can We Do 06 Where We Are 07 Our Services 08 In Hand Projects 11 In Service Projects (References) 20 End 42 SAMAN ENERGY Company Profile 2012 |2
It all began in 2000 • The company was established in 2000 and went into production of Electrical and control systems in 2002. After 4 years of development, it has been one of the professional manufacturer of electrical and control systems in the field of industrial plants in Iran. • In 2005 , the founders resolved to developing company as an EPC contractor of industrial water and waste water treatment plants, Desalination and demineralization plants, condensate polishing plants, RO systems and all other general mechanical and electrical project in the field of power plants and oil & gas utilities. • Today SAMAN ENERGY has been registered as one of the Professional EPC contractor in the vendor list of main clients in Iran as well. • No. Of Employees In 2011: 172 people • Turnover In 2011: 35 Mill. Euro • SAMAN ENERGY with the aid of appropriate tools and equipment accompanied by expert engineering and technical teams, has achieved enormous approaches in design, manufacturing and implementation of various projects and now, equipped with vast reserve of experience in performing these projects is looking outside to offer its engineering and manufactures services to different sections of technology around the globe. In order to facilities technology transfer and primary material procurement, we are in technical and business ties with famous European companies. • The latest projects under taken by us demonstrate our leading position in the industry. • we are sure that brilliant performance in these projects is an introduction to the new phase in establishing our strong position in domestic and global market. SAMAN ENERGY Company Profile 2012 |3
SAMAN ENERGY Organizational chart Share Owner Corporate Executive Office Board Of Directors Management EPC (Turn Key) Projects Activities Production(Industrial Automation) Energy Oil & Gas Water & Waste Water Other Industries Control & Process Systems (PLC,FCS,DCS,PMS,PDCS) Withdrawable MV Panels (Under License of KOHL) Withdrawable LV Panels (Under License of CUBIC) Fixed LV Panels (Under License of ETA) MCC Panels Control Panels Corporate Staff Business Development Finance Human Resource Commercial & communications Global Research SAMAN ENERGY Company Profile 2012 |4
Our Strategy • Our goal is to be the premier domestic and even global General EPC company. We have firmly embedded our corporate responsibility (CR) agenda as a strategic objective within our Company strategy. Our Company strategy emphasises our commitment to total performance in every aspect of our business – not only technical performance, but also business conduct and other parts of our CR agenda. • In order to facilities technology transfer and primary material procurement, we are in technical and business ties with famous European companies. SAMAN ENERGY Company Profile 2012 |5
What Can We Do? • (SAMAN ENERGY Co.): • Industrial Automation (PLC, DCS, FCS, PMS, PDCS …) in Turn-key Application. • Professional Manufacturer in Electrical MCC, LV & MV Panels. • Exclusive Agent of CUBIC/ETA in Iran. (FALAT SANAT IDEH Co.): EPC Contractor for: Industrial Water Treatment Plants (WTP) Municipal Water Treatment Plants (WTP) Condensate Polishing Plants (CPP) Electro Chlorination Plants (ECP) Continuous Electro Deionization Plants (CEDI/EDI) SAMAN ENERGY Company Profile 2012 |6
Where We Are? SAMAN ENERGY Company Profile 2012 |7
Our Services • SAMAN ENERGY Group is utilized with devoted professional teams in various engineering disciplines including tendering, process, mechanical, electrical, instrumentation and control departments. • All engineering categories included in SAMAN ENERGY’s scope of work is covered in these departments by professional experts and all specialists using their scientific and experimental background to fulfill all requirements of our clients. • These departments are in close linkage with scientific and research centers from all over the world in order to keep pace with the latest available technology in our field of activities. • All our effort is preparing in hand projects with the best possible quality, reliability and introducing new techniques and methods in the field of water and wastewater treatment by holding scientific conferences for our clients and offering through tenders. • The engineering services include basic designs and all detail designs of the projects and all documentations regarding latest international standards. • SAMAN ENERGY engineers have close contact with project sites to have supervision on proper installation and performance of plants. • SAMAN ENERGY’s engineering departments operate exclusively in the field of: • 1. Condensate polishing plants, including Hot Condensate Polishing Plants and Cold Condensate Polishing Plants. • 2. Industrial Water Treatment Plants including pretreatment units, filtration units, reverse osmosis systems and Demineralization Plant for various industries such as power plants, refineries, petrochemical projects, steel companies… • 3. Industrial Waste Water Treatment Plants using various methods and technologies for all specific effluent treatment plants after required case studies. • 4. Gas Chlorination Systems and Chemical Dosing System. • 5. Sanitary Waste Water Treatment Plants by means of different methods. • 6. Urban Water Treatment Plants with different available methods for towns and cities with no limitation on capacity. • 7. Pump stations and piping networks. • 8. Electrical and control systems. SAMAN ENERGY Company Profile 2012 |8
Our Services ( cont. ) • Tendering Department : • This department executes a variety of different tasks ranging from reviewing the tender documents, checking the design, preparation of engineering documents as specified in tender documents, preparation of preliminary PFD and P&ID, electrical, instrumentation and control sections of tender, to preparation of price break down. • Process Department : • This department's duties include basic design, detail design, close relation with suppliers, preparation of process documents like PFD, P&ID, Site plan, process description, process calculations, and detail process data sheets… • Mechanical Department : • Among various tasks performed in this department are, designing piping systems, pump stations, pressure vessels, tanks, heat exchangers, screens, gates and other mechanical equipments, preparation of mechanical documents and providing material take off list for procurement department. • Electrical Department : • Here we do things such as designing electrical systems, preparation of related documents and M.T.O lists. • Instrument and control Department : • Our experienced staff in this department perform designing of instrument and control systems, PLC programming, atomization department, preparation of M.T.O lists for procurement department. • Project Planning Department : • In SAMAN ENERGY Group, planning and project controlling is an important core process of project management; it begins as early as the planning phase and accompanies all subsequent project phases until the project has been handed over. As a holistic concept it also covers project steering in addition to actual controlling functions (such as tracking and monitoring deadlines, costs, capacities and progress). Project controlling is based on planned/target/ actual comparisons using numerous project parameters and supplies the management team with ongoing reports that serve as a transparent basis for decision-making. Specific data requirements are defined during the project planning stage. These form the basis of the comparison between target and performance data that takes place during further project stages. Basic project costing is also carried out at this time. The project is continually monitored and steered during the "implementation" and "completion" project phases. During project handover, a concluding analysis and a final costing for the project are carried out. Potential for improvement is analyzed in a targeted manner and knowledge gained is recorded systematically for future projects. Project planning is part of our project management, which relates to the use of schedules such as Gant charts to plan and subsequently report progress within the project environment. Initially, all the project activities and their requirements or features are defined and the appropriate methods for completing the project are determined. Following this step, the durations for the various tasks necessary to complete the works are listed and grouped into a work breakdown structure. The logical dependencies between tasks are defined using an activity network diagram that enables identification of the critical path Float or slack time in the schedule can be calculated using project management software such as MSP or Primavera. Then the necessary resources can be estimated and costs for each activity can be allocated to each resource, giving the total project cost. At this stage, the project plan may be optimized to achieve the appropriate balance between resource usage and project duration to comply with the project objectives. SAMAN ENERGY Company Profile 2012 |9
Our Services ( cont. ) • Once established and agreed, the plan becomes what is known as the baseline. Progress will be measured against the baseline throughout the life of the project. Analyzing progress compared to the baseline is known as earned value management • In order to do all above, the planning and project control experts in SAMAN ENERGY Co. use all their experiences and knowledge to offer the optimum ways. • Project control is the element of a project that keeps it on-track, on time, and within budget. Project control begins early in the project with planning and ends late in the project with post-implementation review, having a thorough involvement of each step in the process. Each project should be assessed for the appropriate level of control needed; too much control is too time-consuming, too little control is too costly. Control systems are needed for cost, risk, quality, communication, time, change, procurement, and human resources. In addition, auditors should consider how important the projects are to the financial statements, how reliant the stakeholders are on controls, and how many controls existing. Auditors should review the development process and procedures how they are implemented. • The process of development and the quality of the final product may also be assessed if needed or requested. A business may want the auditing firm to be involved throughout the process to catch problems earlier on so that they can be fixed more easily. An auditor can serve as a controls consultant as part of the development team or as an independent auditor as part of an audit. • Procurement Department : • In SAMAN ENERGY Group, all elements of procurement activity, from identifying need, challenging that need, considering options, procuring the appropriate goods, services or works, effective supplier and contract management, through to the disposal of assets. • The many solutions are available to the economic council, from establishing corporate contracts, using collaborative and consortia arrangements, through to developing long-term strategic partnerships. • This Strategy continues to provide a clear focus on balancing two priorities: • 1. Identifying and delivering efficiencies, but not at the cost of quality, and • 2. Developing unflinching procurement. • These two priorities can be reconciled through adopting a mixed economy approach, evaluating on the basis of whole life costs, and breaking down the barriers to council opportunities. • Procurement department responsibilities include maintaining lists of prospective and approved vendors, soliciting bids or proposals trough tendering department, negotiating price and terms and conditions of purchase, selecting suppliers and issuing purchase orders. Procurement assistants work with buyers and perform a variety of procurement administrative functions. • The procurement department is responsible for negotiating, writing and executing written contracts. Contract specialists negotiate and write consulting agreements, sponsored project subcontracts, repair and construction agreements, architectural, engineering and other services agreements and service order agreements. SAMAN ENERGY Company Profile 2012 |10
Automation ProjectsIn Hand Projects 1. Kish Sewage Dist. Control and Telemetry System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Kish Waste Water Company Sazeh Abi Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Telemetry : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Trio Datacom (Schnider Electric), for 10 Stations Profibus/Industrial Ethernet/ModBus CPU/Communication/HMI 2. Genaveh Combined Cycle Power Plant, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Genaveh Power Generation Company (BOO Project) Mapna MD3/ Pakman Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H Wincc Flexible Profibus/Industrial Ethernet CPU/Communication SAMAN ENERGY Company Profile 2012 |11
Automation ProjectsIn Hand Projects Cont… 3. Fars Combined Cycle Power Plant, Auxiliary Boiler Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Novin Fan AvarEhya Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 4. South Pars Gas Field Development Phases 1 Onshore Facilities, Emergency Switchgear : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract SPGC SPGC Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Incoming Feeders : Diesel Gen. : Main Outgoings: : Cubicle : Main Equipment : Protection Relays : 3 sets of 2500 A, 4Pole, 70KA 2 sets of 2500 A, 4Pole, 70KA 4 Sets of auxiliary turbine generators, 1250A Cubic (Withdrawable) Schneider Electric Alstom, Micom Series SAMAN ENERGY Company Profile 2012 |12
Automation ProjectsIn Hand Projects Cont… 5. South Pars Gas Field Development Phases 1&2 Onshore Facilities, MCC Panel: Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract SPGC SPGC Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Cubicle : Equipment : Cubic (Withdrawable) Schneider Electric 6. Zafar & Faraman DCS 63/20 KV Substation : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tavanir Trans Post Pars Control & Protection, Measuring and SCADA and AVR System Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT. System/Technology : System : DCS Substation SAMAN ENERGY Company Profile 2012 |13
Automation ProjectsIn Hand Projects Cont… 7. Damavand Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for units 1,…,6 of Power Plant : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Energy va Palayesh Ab kherad. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 8. Yazd Solar Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for units1, 2 of Power Plant : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Mapna MD2 Energy va Palayesh Ab kherad. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |14
Automation ProjectsIn Hand Projects Cont… 9. Sanandaj Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System for units 1,2,3 of Power Plant : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Energy va Palayesh Ab kherad. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 10. Dalahoo 63/20 KV Substation, LVAC/DC, Protection and Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tavanir Trans Post Pars Engine Control & Protection, Measuring and SCADA and AVR System Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT. System/Technology : Cubicle : Equipment : Fixed Schneider Electric/Siemens SAMAN ENERGY Company Profile 2012 |15
Automation ProjectsIn Hand Projects Cont… 11. Arghavan 63/20 KV Substation, Protection, Control, AC/DC System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tavanir Darian Co. Control & Protection, Measuring and SCADA and AVR System Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT. System/Technology : Cubicle : Equipment : Fixed Schnider Electric SAMAN ENERGY Company Profile 2012 |16
Automation FieldIn Service Projects 1. Sari Waste Water Treatment Plant, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Mazandaran Water & Wastewater Company Sazeh Abi Co. (Consultant: SNC Canada) Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 2. Jandar Combined Cycle Power Plant, Water Treatment Plant (WTP), MCC Switchgears. : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEEGT (Syrian Power Generation Company) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Cubicle : Equipment : Cubic (Withdrawable) Schneider Electric SAMAN ENERGY Company Profile 2012 |17
Automation FieldIn Service Projects Cont… 3. Jandar Combined Cycle Power Plant, Condensate Polishing Plant (CPP), MCC Switchgears. : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEEGT (Syrian Power Generation Company) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Cubicle : Equipment : Cubic (Withdrawable) Schnider Electric 4. Abadan/Jahrom/Sanandaj Combined Cycle Power Plants, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) MAPNA MD2/Pakman Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H WinCC Flexible Profibus/Industrial Ethernet CPU/Communication SAMAN ENERGY Company Profile 2012 |18
Automation FieldIn Service Projects Cont… 5. Pareh Sar And Tishreen Combined Cycle Power Plants, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Pareh Sar GmbH (BOT Project)/PEEGT (Syrian Power Generation Company) Mapna MD2/Pakman Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H WinCC Flexible Profibus/Industrial Ethernet CPU/Communication 6. Damavand/Yazd Combined Cycle Power Plants, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) MAPNA MD2/Pakman Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H WinCC Flexible Profibus/Industrial Ethernet CPU/Communication SAMAN ENERGY Company Profile 2012 |19
Automation FieldIn Service Projects Cont… 7. Damavand Combined Cycle Power Plant, Main and Auxiliary Cooling System, Heat Tracing System for units 1,…,6 : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/NiroTavan Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, System/Technology : System : Low Voltage Fixed Switchgears 8. LAVAN REFINERY UPGRADING & REVAMPING PROJECT OFFSITE UTILITY & STORAGE TANK PROJECT, Condensate Polishing Plant (CPP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract LAVAN OIL REFINING COMPANY Iran General Contractor Co. (IGC) Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 Wincc Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |20
Automation FieldIn Service Projects Cont… 9. Tishreen Combined Cycle Power Plant, Condensate Polishing Plant (CPP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEEGT (Syrian Power Generation Company) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC (Touch Panel) Profibus/Industrial Ethernet CPU/Communication/HMI 10. Pareh sar Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Pareh Sar GmbH (BOT Project) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 Wincc Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |21
Automation FieldIn Service Projects Cont… 11. Pareh sar Combined Cycle Power Plant, Electro chlorination System (ECP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Pareh Sar GmbH (BOT Project) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 12. Nigeria 230/20KV Substation LVAC/DC, Protection and Control Systems : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Nigerian Power Distribution Company Trans Post Pars. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Cubicle : Equipment : Fixed, Swing Type Schneider Electric/Siemens SAMAN ENERGY Company Profile 2012 |22
Automation FieldIn Service Projects Cont… 13. Sangtoodeh PDB and 48 VDC Charger system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tajikestan Power Company Trans Post Pars. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Panel : Equipment : Fixed, Swing Type Schnider Electric/ABB 14. Fars Gas Power Plant (2), Fuel Plant Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Mapna MD2 Novin Fan AvarEhya Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Siemens, S7 300, CPU 315 2DP Wincc Flexible Profibus/Industrial Ethernet CPU:SW/Communication/HMI SAMAN ENERGY Company Profile 2012 |23
Automation FieldIn Service Projects Cont… 15. Jagin and Barantin Substation, Protection and Control Systems : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tavanir Trans Post Pars. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Panel : Equipment : Fixed, Swing Type Schnider Electric/Siemens 16. Besat and Mahshahr Substation, Protection and Control Systems : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Tavanir Trans Post Pars. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : Panel : Equipment : Fixed, Swing Type Schneider Electric/Siemens SAMAN ENERGY Company Profile 2012 |24
Automation FieldIn Service Projects Cont… 17 Shirvan Combined Cycle Power Plant, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Pakman (currently is hold by mapna) Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H Wincc Flexible Profibus/Industrial Ethernet CPU/Communication 18. Jandar Combined Cycle Power Plant, Auxiliary Boiler, Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEEGT (Syrian Power Generation Company) Mapna MD2/Pakman Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI (Touch Panel) : Networking : Redundancy : Omron CPU 65H Wincc Flexible Profibus/Industrial Ethernet CPU/Communication SAMAN ENERGY Company Profile 2012 |25
Automation FieldIn Service Projects Cont… 19. Sanandaj Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Novin Fan AvarEhya. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 20. Abadan Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Aroon Ab. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |26
Automation FieldIn Service Projects Cont… 21. Esfahan-II Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Aroon Ab. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 22. Genaveh Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Genaveh Power Generation Company (BOO Project) Mapna MD3 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |27
Automation FieldIn Service Projects Cont… 23. Neka Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Shafab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S5 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 24. Yazd Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Shafab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S5 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |28
Automation FieldIn Service Projects Cont… 25. Kazeron Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Shafab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S5 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 26. Damavand Combined Cycle Power Plants, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2/Aroon Ab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |29
Automation FieldIn Service Projects Cont… 27. Kerman Combined Cycle Power Plant, Water Treatment Plant (WTP), Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna MD2 Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 28. Ramshir Gas Station Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract INGC Patsa IND. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT. System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |30
Automation FieldIn Service Projects Cont… 29. CNG Station Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Pars Comperssor Pars Comperssor Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : BECHOFF BECHOFF Profibus/Industrial Ethernet 30. Siri Gas Compression Station Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEDCO PEDCO Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |31
Automation FieldIn Service Projects Cont… 31. PVC, BD/SR, PP, LDPE, HDPE Cooling Tower Side Filteration Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract BIPC Bina Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU:SW/Communication/HMI 32. SUV Conveyor Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Iran KhodroKhorasan KhodroSaziBinalod Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |32
Automation FieldIn Service Projects Cont… 33. Zamiad Painting Line Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Pars Khodro Pars Khodro Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 34. Abhar Train Production Line Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Iran Khodro Irico Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |33
Automation FieldIn Service Projects Cont… 35. Mega Motor Data Center : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Mega Motor Mabna Fan AvaranRayaneh Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 36. 206 montage Line Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Iran Khodro Co. TAM CO. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |34
Automation FieldIn Service Projects Cont… 37. PK Line Control System Upgrade : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Saipa Co. Saipa Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 38. L90 Line : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Iran Khodro Co. TAM CO. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |35
Automation FieldIn Service Projects Cont… 39. Syrian Samand (shom) Production Line Control System : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Iran Khodro Saipa Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 40. Mashhad 3rd Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract KhorasanRigional Water Company Sazeh Abi Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |36
Automation FieldIn Service Projects Cont… 41. SAHAND Thermal Power Plant Water Treatment Plant (WTP), Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract IPDC (Iran Power Development Company) Mapna Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 42. MaraghehWasteWater Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Azarbayejansharghi Water & Waste Water Company MahabGhods Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Advantech Remote I/O WinCC RS 485 SAMAN ENERGY Company Profile 2012 |37
Automation FieldIn Service Projects Cont… 43. Lahijan Waste Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Gilan Water & Waste Water Company Iranab Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU/Communication 44. Baneh Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Kordestan Regional Water Company MahabGhods Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : Networking : Toshiba RS 485 SAMAN ENERGY Company Profile 2012 |38
Automation FieldIn Service Projects Cont… 45. Loshan Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Gilan Water & Waste Water Company Iranab Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-400 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI 46. Rasht Waste Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Gilan Water & Waste Water Company Iranab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |39
Automation FieldIn Service Projects Cont… 47. Banias Steam Power Plant, Water Treatment Plant (WTP), Control system (DCS) : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract PEEGT (Syrian Power Generation Company) Azarab Energy Co Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : ABB, AC800F ABB, AC800F Profibus/Industrial Ethernet CPU/Communication/HMI 48. Esfahan Oil Refinery Co, 6th Boiler, Condensate Polishing Plant (CPP), Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Esfahan Oil Refinery Co. Azarab Co. Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Redundancy : Siemens SIMATIC S7-300 WinCC Profibus/Industrial Ethernet CPU/Communication/HMI SAMAN ENERGY Company Profile 2012 |40
Automation FieldIn Service Projects Cont… 49. Joybar Waste Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Mazandaran Water & waste Water Co. Jarf Tara Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : System : Conventional (Relay Based) 50. TorbatHydarieh Waste Water Treatment Plant, Control system : Owner : ………………………………...………………..……. Client : ……………………………….…………………………. Abstract Khorasan Water & Waste Water Co. Digab Engineering (Basic and Detail Design, Procurement, Panel Manufacturing, PLC Programming, HMI Design, FAT, SAT, Commissioning System/Technology : PLC : HMI : Networking : Omron WinCC RS485 SAMAN ENERGY Company Profile 2012 |41
Thank You SAMAN ENERGY Company Profile 2012 |42