Gamma-ray Large Area Space Telescope GLAST Large Area Telescope: Electronics, Data Acquisition & Flight Software System Engineering Gunther Haller Stanford Linear Accelerator Center Manager, Electronics, DAQ & FSW LAT Chief Electronics Engineer haller@slac.stanford.edu (650) 926-4257
System Engineering Outline • System Overview • Changes since PDR • External Interfaces • Internal Interfaces • Technical Budget • Verification & Test • Risk • FMEA • Reliability Allocations • Parts and Spares Plan • Drawing Tree
Data-Acquisition (DAQ) System Overview • Configuration, triggering, event-flow control and readout, monitoring, and supply of power to • 16 Calorimeter and Tracker towers with a total of 850,000 tracker channels and 3,000 calorimeter channels • 12 ACD front-ends with a total of 208 ACD channels • Interface to spacecraft for control, data, monitoring, and power • Trigger system (hardware selection of possibly interesting events) • Event filtering • Housekeeping • Operational thermal control
Tower Electronics Module Interface to calorimeter and tracker on each tower Monitoring Combination of sub-system trigger signals to primitives Event buffering GAS Unit Command-response unit receives and distributes command, clock, and data Global trigger unit generates LAT-wide readout decision signals based on trigger primitives from TEM’s and ACD Event-builder unit builds complete LAT events out of asynchronous event-fragments; Forward complete events to dynamically selected target EPU’s or spacecraft ACD electronics module tasks much like TEM for TKR/CAL EPU: Event processor unit runs filter algorithm to reduce 10kHz input event rate down to 30 Hz (with two EPU’s) SIU: Spacecraft interface unit controls LAT and interfaces to spacecraft Instrument software runs on EPU and SIU processors only Power system not shown LAT Electronics Hierarchy
LAT Electronics Physical TKR Front-End Electronics (MCM) 16 Tower Electronics Modules • DAQ electronics module (DAQ-EM) • Power-supplies for tower electronics ACD Front-End Electronics (FREE) TKR CAL Front-End Electronics (AFEE) CAL Global-Trigger/ACD-EM/Signal-Distribution Unit* 3 Event-Processor Units (2+1 spare) • Event processing CPU • LAT Communication Board • SIB Spacecraft Interface Unit • Spacecraft Interface Board (SIB): Spacecraft interface for MIL1553 control & data • LAT control CPU • LAT Communication Board (LCB): LAT command and data interface Power-Distribution Unit (PDU)* • Spacecraft interface, power • LAT power distribution • LAT health monitoring * Primary & Secondary Units shown in one chassis
Changes since PDR • Spacecraft Selection and Meetings: • PDU was moved to opposite side of SIU to match SC power/C&DH physical partitioning • Signal levels (discretes, 1 PPS, Science Interface, GBM GRB signal) were officially changed to LVDS (before undefined or RS422), March 03 • Recently finalized power, analog monitoring, and discrete interface to SC • Defined MIL1553 command set/interface • Separated SIU prime and redundant into separate (and identical) crate assemblies since cross-connection to SC prime and redundant was solved on the SC-LAT interface level and lead to removal of direct SIU-SIU inter-connections Before SC selection After SC selection
Changes since PDR (Con’t) • Event-Builder was moved from CPU crates to GAS unit • Reduced complexity of inter-connections • Reduced hardware from 3 event-builder blocks to 2 (1 prime, 1 redundant), and power dissipation from two event-builder blocks to one • SIU crate was modified to be the same as EPU crate • Removes mechanical, thermal, electrical design effort for one assembly • Moved SC science interface from Spacecraft Interface Board in SIU to event-builder in GASU • Additional benefit that SIB board is almost identical to existing SECCI version (both boards are designed by NRL/Silver Engineering), major simplification • Science interface on GASU is small change since GASU already transmits event data to LAT CPU’s, so additional target is incremental • Added SIB board in each EPU crate to provide local EEPROM • Simplification in software effort. • No remote booting code development/testing required.
External Interfaces • All external DAQ interfaces released with the exception of spacecraft interface and mechanical/thermal interface (mainly to X-LAT plate)
Internal Interfaces • All internal interfaces are final, documents are being updated, release before CDR
DAQ Technical Budget Summary Technical Resources • DAQ Mass • Sub-system allocation: 220 kg • Detailed estimate: 199.3 kg • DAQ Power • Subsystem allocation: 318 W • Detailed estimate: 313.8 W • CPU Cycles • Allocation: 2 CPU’s • Detailed estimate: < 1 CPU • For detailed breakdown see Power/Mechanical/Software presentations
Verification & Test Model Development • Hardware and software development closely integrated • Design of hardware versus software complexity optimized continuously • Software runs with LAT engineering model electronics • Continuous hardware versus software verification • Full system including sub-system electronics from and at other institutions • Independent verification process • Exchange of hardware and software -> • ACD hardware, TKR hardware, CAL hardware • DAQ hardware • Flight software, I&T software • ACD Scripts, TKR scripts, CAL scripts, DAQ scripts • No integration at flight- LAT integration stage of components which have not operating fully integrated in earlier stages • Exception is spacecraft, since simulator is only simulating and is not real hardware/software Hardware Design Fab Test Software Design/Develop Develop/Test Formal Test Release to I&T
Verification & Test (Con’t) Development Cycles EM 1 Release to I&T Release to sub-systems EM2 Release to I&T Release to sub-systems FU Release to I&T • Three development cycles • Engineering Model 1 • Single tower, single CPU • Engineering Model 2 • Multiple tower, single CPU • Flight Model • Multiple towers, multiple CPU’s • Peer-Reviews after end of each development cycle • In addition regular LAT reviews (Manufacturing Readiness Review, etc)
Test Matrix Applies to each board and assembly. In this slide the tests at each level are listed
Electrical & Environmental Test Flow LAT Qual • LAT Test Accept • LAT Test TEM DAQ/PS Qual • Elec Accept • Elec PDU EPU SIU GASU TEM DAQ TEM PS Qual • Elec • Sine Vibe • Random Vibe • Thermal Vac • EMI/EMC Accept • Elec • Static Load • Random Vibe • Thermal Vac Qual • Elec • Sine Vibe • Random Vibe • Thermal Vac • EMI/EMC Accept • Elec • Static Load • Random Vibe • Thermal Vac Qual • Elec • Sine Vibe • Random Vibe • Thermal Vac • EMI/EMC Accept • Elec • Static Load • Random Vibe • Thermal Vac
Risk • No single DAQ system failure can degrade LAT Electronics capabilities below minimum science requirements • Failure in SIU, PDU, or GASU can require use of the respective redundant unit • Failure in one of the two EPU’s can require use of the redundant EPU unit. A second failure will reduce the available EPU CPU power by a factor of 2. • Failure in TEM power-supply or TEM DAQ module can lead to • Loss of a full tower (most of the assembly is single string) • Loss of the calorimeter or parts of it • Loss of the tracker or parts of it
FMEA Fault Tree Analysis – LAT-TD-01757-01 (Draft) FTA’s completed on EPU’s, GASU’s, PDU’s, SIU’s, TEM’s, & TEM/PS’s No single point failures without ground contingency – (Software) Most components multiply redundant (More than one redundant component) Non-redundant with in redundant systems identified. Failure Mode & Effects Analysis - LAT-TD-00374-01 (Being Drafted) Failure modes identified Effects analysis underway Probability being linked to component failure No criticality 1, or 2 failures Few 2R failures, mostly 2MR thru 5 failures
Reliability Allocation Mission 70% (Pf = .3) Observatory 85% (Pf = .15) LAT 85% (Pf = .15) DAQ 96% (Pf = .04) Tower Electronics GASU PDU SIU EPU Harness TEM DAQ TEM PS SIB LCB PSB CPU incl FSW Back Plane
Parts Lists • Parts Lists • Electrical component list for DAQ submitted to Electrical Parts Control Board and most parts are approved (see later presentation) • Mechanical components list for DAQ submitted to Mechanical Parts Control Board
Spares Plan * Qualification Models are flight spares ** EPU does not have separate qualification since crate is the same as SIU crate
Technical Issues and Status • No known technical issues in respect to functionality and performance except potentially • TEM GTCC and GCCC ASIC (back from fabrication end of 3/03) • Reliability; Analysis in progress
Summary • Changes since PDR described • Interfaces documents released and under change control • Technical budget at CDR level with sufficient margin • Verification and test plans documented • Risks contained in LAT database with mitigations • FMEA and reliability well under way • Drawing tree well advanced • System engineering will be at CDR level by CDR time • Main remaining item is completion of reliability analysis