An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. FEE for PHOS #3 01/10/2008 PHOS Meeting Fumihiro Chuman, Takashi Iwasaki Hiroshima Univ. Quark Physics Lab.

  2. Introduction • 112 FEEs are necessary for PHOS#3. The mass production of the FEE were done at Wuhan, and 124 FEEs had reached from Wuhan already last Spring. All of them have already passed tests at Wuhan. • They need to be modified and tested before installation. • With help by Sasha and Dong, we did the following modification and operation check from 28/07/2008 to 25/08/2008 to make FEEs of PHOS#3 ready for installation.

  3. Modification • Remove resistance 1758 and change resistance R84 to 2.7k • Remove ST2 Jumper and put ST1 Jumper • Glue socket for shielding • Glue TY connector for reinforcing • Detail slides are in back up

  4. Operation Check Set up • Switch on FEE by apdgui • check whether the FEEs are switched on • Reprogram firmware • The one for the test -> Bergen 3.5 • Stress-test the FEEs • Write values to ADC and some resisters and confirm whether same values can be read. • Switch off FEE by apdgui • check whether the FEEs LED switch off • Repeat above 1-4 steps if any problem happen. DAQ computer

  5. Test results and conclusion • Number of FEE:124 • Good FEE: 109 • Bad FEE : 15 • Missing TY connector: 7 • But 6 FEE passed operation check • Operation problem: 9 • One FEE have both problem • I put those details below • https://www.hepl.hiroshima-u.ac.jp/member/record/iwasaki/0823_PHOS3_modification_and_test.xls • The number of good FEEs doesn't reach 112 pieces necessary for the installation. Dong is investigating the bad FEE and plans to prepare enough FEE for PHOS #3 installation.

  6. Back up

  7. Modification 1 • Remove a resistance 1758 and replace a resistance R84 to 2.7k • Resistance 1758 was used when the test of the GTL bus without RCU, and now it doesn’t need because it’s contained in RCU. • The value of the resistance R84 was wrong due to a design error. • Remove ST2 jumper and put ST1 jumper ST2 jumper Change R84 to 2.7K

  8. Modification 2 • Glue 23 sockets for supporting cooling cupper plates. • Glue TY connector for reinforcing • This connector was fragile

  9. Details of operation problems • FEE020007: Stress test failedFEE020030: Couldn’t power onFEE020034: Stress test failed and LED didn’t flashFEE020094: Stress test failedFEE020159: Stress test failedFEE020163: Couldn’t power off but stress test is goodFEE020167: Couldn’t power off but stress test is goodFEE020242: Couldn’t power onFEE020244: Couldn’t power off but stress test is good

  10. TY connector • TY connector is output from each of 14 FEEs to TRU for sum of all amplitudes. Reinforced TY connector Missing TY connector