Scope of Part - B : Strengthening of Distribution System. Fund Allocation of Part - B: Proposed fund allocation Rs 40,000 Cr. RESTRUCTURED APDRP-II IN XI PLAN. Collection of data Physical, Loading, Losses, Voltages Computerise Data Validate Data Benchmark Performance Parameters
E N D
Scope of Part - B : Strengthening of Distribution System. Fund Allocation of Part - B: Proposed fund allocation Rs 40,000 Cr. RESTRUCTURED APDRP-II IN XI PLAN
Collection of data Physical, Loading, Losses, Voltages Computerise Data Validate Data Benchmark Performance Parameters Prioritise feeders/DTs Group feeders for Optimisation Steps for Preparation of DPR Contd…
Evaluate options R&M, Augmentation, New Work Cost benefit analysis Prioritise & Shortlist Finalisation of DPR & submission to nodal agencies Steps for Preparation of DPR
Executive Summary Introduction Objective Scope & Cost Estimate Benefits Implementation Schedule Payback Period Contents of DPR
Town/circle profile & organization setup Consumers profile Existing distribution system with sources of supply Details of sub stations, feeders, DTs with electrical and physical boundaries etc. History of Load growth & Consumer growth Power and energy flow details Metering details at all voltage levels HT/LT Ratio Organisation Setup Contents of DPR
Commercial performance Billing details Input Energy Billed Energy Revenue Billed Revenue Realised T&D and AT&C losses Feeder outage and reliability index Power & Distribution transformer failure rate Contents of DPR
Constraints & Difficulties in the existing system Adequacy of EHV transformation capacity for supply of power Adequacy of Sub Transmission capacity at 66kV or 33 kV level sub stations Overloading of 66kV or 33 kV, 11 kV and 440 volts feeder Overloading of distribution transformers Contents of DPR
5. Scope of R&M works for Existing Sub station Feeders (including reconductoring, Bifurcation, Segregation, Conversion to under ground cable, Conversion to Arial Bunch Cable (ABC) etc. Distribution Transformers Service connection Contents of DPR
6. Scope of New Works for New Sub station New Feeders High Voltage Distribution System (HVDS) New DTs Capacitor bank - HT & LT New Service connection Contents of DPR
Project Implementation schedule Schedule for NIT,OBD & LOA. Schedule for Project Execution Contents of DPR
COST BENEFIT ANALYSIS Estimated cost of the scheme Increase in annual revenue due to Increased energy consumption (Load growth) Reduction in technical losses Reduction of commercial losses Total annual benefit Payback period Contents of DPR
Contents of DPR Bench marks of performance (Yearly)