Ontario International Airport TCE Technical Briefing

Ontario International Airport TCE Technical Briefing. December 5, 2005. Location of Chino Basin. Location of Municipal and Desalter Wells. Facilities Required for VOC Plume Mitigation. Facility Capital Cost. Facility Annual O&M Cost. Present Worth Analysis.

hansel
Download Presentation

Ontario International Airport TCE Technical Briefing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Ontario International AirportTCE Technical Briefing December 5, 2005

  2. Location of Chino Basin

  3. Location of Municipal and Desalter Wells

  4. Facilities Required for VOC Plume Mitigation

  5. Facility Capital Cost

  6. Facility Annual O&M Cost

  7. Present Worth Analysis • Present worth of facilities calculated at 5 percent interest for the following periods:

  8. Other Non-Quantified Costs • Replacement water cost to farms and dairies • Additional cost of treatment at desalters • Opportunity costs • Cannot drill new wells in OIA plume area • Loss of flexibility for Watermaster storage programs

  9. Questions?