270 likes | 720 Views
BACKGROUND. Alexandra Renewal Programme started in 2001A number of documents were developed even before the ARP, In 1998 for instance 3 Volumes of Greater Alexandra Development Framework were developed by the Eastern Metropolitan Local CouncilOn the 2
E N D