1 / 8

WP12: Innovative RF Technologies

WP12: Innovative RF Technologies. Co-ordinators: Peter McIntosh (STFC Daresbury Laboratory) Wolf Dietrich-Moller (DESY) Stephane Chel (CEA). Co-ordinators: Peter McIntosh (STFC Daresbury Laboratory) Wolf Dietrich-Moller (DESY) Juliette Plouin (CEA). EUCARD-2 Funding.

Download Presentation

WP12: Innovative RF Technologies

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP12: Innovative RF Technologies Co-ordinators: Peter McIntosh (STFC Daresbury Laboratory) Wolf Dietrich-Moller (DESY) Stephane Chel (CEA) Co-ordinators: Peter McIntosh (STFC Daresbury Laboratory) Wolf Dietrich-Moller (DESY) Juliette Plouin (CEA)

  2. EUCARD-2 Funding • EUCARD-2 officially started on 1st May 2013. • Formal funding of collaborator contributions has been initiated: • Supporting Staff, Consumables, Prototypes and Travel. • EUCARD-2 Website is live at: • http://eucard2.web.cern.ch/EuCARD2/index.html

  3. WP12 Resources 12.1 12.2 12.3 12.4 12.5

  4. WP12 Milestones Task 12.2 Task 12.3 Task 12.4 Task 12.5

  5. WP12 Deliverables Task 12.2 Task 12.3 Task 12.4 Task 12.5

  6. EUCARD-2 Reporting • EU Reports Required: Fewer than EUCARD! • Structure: 1 report/year • plus updating of the 12-month report to become the Period 1 Report). • Deadlines(for each report): • Input from Task Leaders to WP Coordinators Y+1010 May • Input from WP Coordinators to Project Coord. Y+2020 May • Draft submitted to Steering Committee Y+3030 May • Draft approved by GB at Annual Meeting ~10 June • Report submitted to EC (when required) Y+6030 June • Size: • Inputs from Task Leaders: maximum 2 pages, including 1 or 2 pictures, graphs, tables. • Inputs from WP coordinators: input from Tasks (between 8 and 12 pages) plus an executive summary.

  7. WP12 Annual Reviews • Propose to host WP12 Annual Review meetings @ ~Y-30 (April 1st 2014, 15, 16 and 17) to fulfil co-ordination and reporting requirements. • Dates/locations to be confirmed in consultation with Task coordinators. • Let’s get started!

  8. Thank you for all your on-going support in delivering a High Impact Innovative RF Programme.

More Related