SPR part II: Eligibility. Jack Jernigan Office of Research, Development, and Technology (RD&T) Turner-Fairbank Highway Research Center (TFHRC) McLean, VA. Eligibility Highlights: The Basics, Making a Determination. 23 USC 505 23 CRF 420 Cost Principles OMB Circulars.

haru
Download Presentation

SPR part II: Eligibility

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SPR part II: Eligibility Jack Jernigan Office of Research, Development, and Technology (RD&T)Turner-Fairbank Highway Research Center (TFHRC)McLean, VA

  2. Eligibility Highlights: The Basics, Making a Determination • 23 USC 505 • 23 CRF 420 • Cost Principles • OMB Circulars

  3. 1st Step: The Foundation • 23 USC 505 State Planning & Research • (5) Research, development, and technology transfer activities necessary in connection with the planning, design, construction, management, and maintenance of highway, public transportation, and intermodal transportation systems. • (6) Study, research, and training on the engineering standards and construction materials for transportation systems described in paragraph (5), including the evaluation and accreditation of inspection and testing and the regulation and taxation of their use.

  4. 2nd Step: Regulatory Language: Highlights • What costs are eligible? (23 CFR 420.113)  • Necessary and reasonable for respective project objectives • Satisfy criteria for allowable costs found in cost principles (49 CFR 18.22) • All other relevant criteria in 23 CFR 420

  5. Applicable Cost Principles • Set of Federal principles for determining allowable costs for each kind of organization • Allowable costs determined by cost principles applicable to the organization incurring the costs.

  6. 3rd Step: Cost Principles(49 CFR 18.22)

  7. 4th Step: OMB Circular A-87 • OMB Circular A-87: State, local or Indian tribal government • Purpose: Establishes principles and standards for determining costs for Federal awards carried out through • grants, cost reimbursement contracts, and other agreements with • State and local governments and federally-recognized Indian tribal governments (governmental units).

  8. Eligibility Example • Is equipment cost an eligible use of SP&R funds? • Step 1: Refer to 23 USC 505 (a)(5) and (6) • Step 2: Refer to 23 CFR 420.113 • What costs are eligible from a regulatory standpoint?

  9. Eligibility Example continued… • Step 3: Refer to list of cost principles • OMB Circular A-87; OMB Circular A-122; OMB Circular A-21; 48 CFR part 31 • Step 4:  Refer to attachments in respective Circular • General principles and selected items for costs

  10. Thank You!Questions?