1 / 4

Great Construction Projects The Hoover Dam

Great Construction Projects The Hoover Dam. The Hoover Dam. The Hoover Dam, originally known as Boulder Dam, is both the world's largest electric-power generating station and the world's largest concrete structure . It is currently the world's 35th-largest hydroelectric generating station

harwood
Download Presentation

Great Construction Projects The Hoover Dam

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Great Construction Projects The Hoover Dam

  2. The Hoover Dam • The Hoover Dam, originally known as Boulder Dam, is both the world's largest electric-power generating station and the world's largest concrete structure. • It is currently the world's 35th-largest hydroelectric generating station • Named after Herbert Hoover • Gave many people jobs during the Great Depression • There were 112 deaths associated with the construction of the dam; 96 of them at the construction site

  3. The Hoover Dam –Construction • The construction period was from April 20, 1931 to March 1, 1936, ending over two years ahead of schedule. • The construction cost was $49 million in 1936, which would be $736 million in 2008, due to inflation. • Originally, there were 16 big generators, 8 on each side of the river, but 2 smaller ones replaced one big one on the Arizona side, adding up to 17 generators total. • The construction team totaled approximately 5,000 people at any given time, and a total of about 15,000 people were employed over the course of construction.

  4. Dam height: 726.4 ft (221.4 m) Dam length: 1244 ft (379.2 m) Dam thickness: 660 ft (200 m) at its base; 45 ft (15 m) thick at its crest. Concrete: 4.36 million yd³ (3.33 million m³) Traffic across the dam: 13,000 to 16,000 people each day The Hoover Dam –Statistics