240 likes | 380 Views
( 1 ) Validation of S-NPP Sounding Products Using Conventional and Reference/Dedicated Observations. Tony, Nick Nalli , Frank Tilley, Bomin Sun, Flavio , Changyi , Murty , Antonia …. NOAA Products Validation System (NPROVS). NPROVS+. NUC. MiRS NPP. IDPS. GTS (CFSR+GFS). X ?.
E N D
( 1 )Validation of S-NPP Sounding Products Using Conventional and Reference/Dedicated Observations Tony, Nick Nalli, Frank Tilley, Bomin Sun, Flavio, Changyi, Murty, Antonia …
NPROVS+ NUC MiRS NPP IDPS GTS (CFSR+GFS) X ? Dedicated + Reference + COSMIC DualReg ECMWF NPROVS 137 IASI (NOAA) AIRS v6 Daily; 7-day delay (NetCDF / HDF5) IASI stamp NUCAPS stamp AIRS stamp IDPS stamp Daily; nrt g r a n u l e s +SDR: CrIS, ATMS, VIIRS, AIRS, MODIS, IASI, AVHRR…
GCOS “Reference” Upper AIR Network (GRUAN) Illustration of the initial set of 15 sites composing the Global Climate Observing System (GCOS) Reference Upper Air Network (GRUAN). Each site provides one or more reference radiosonde observation per week along with specified ancillary ground (lidar, MWR, FTIR …) observations. A reference observation in the context of GRUAN includes adherence to best measurement practices as specified in the GRUAN Manual and Measurement Guidelines including specification of measurement and product uncertainty. Expansion of GRUAN to up to 40 sites within the next five year is planned.
Vaisala RS92 … JPSS Suomi-NPP “dedicated” cal/val program (Nalli… )
Ref / Ded Sampling Strategies • Actual Propose • 3 ARM sites • Dual at SGP every 4th; annual • Combo dual / single at NSA every 4th day … (save 45 RS92) • Single at TWP every 4th day • Beltsville and PMRF provide sporadic single dedicated RS92, sporadic • AEROSE • Support 2 dedicated GRUAN sites using “saved” from ARM + JPSS budget (40K) • GRUAN (10 sites incl ARM) provide reference RS92; multiple daily, sporadic
GRUAN processing of dedicated RAOB from ARM from other dedicated from other global RS92 … reference with uncertainty estimate
ARCHIVE PDISP, NARCS, tbd.pp ( 0-order ) operational Ded / Ref Collocations 7-day delay Append Stamps Re-Retrieve (Single EDR ...) (DualR, 1st order, 2nd…) NUCAPS, IDPS, IASI, … AIRS, (scripts) DualR managed by project Ded / Ref Collocations (+ DualR, ReRet1 …) (project archive) Guides Development Publications PDISP, NARCS, tbd … p Ref/DedDataSet and Re-Retrieval
( 2 )IDPS Mx6.6 to 7.1 Tony Reale Bomin Sun Michael Pettey MurtyDivikarla
IDPS MX 6.6 vs. MX 7.1YIELD MX6.302/22 02/23 02/24 02/25 4 days (10 day) • IR+MW 20% 17% 18% 23% 19% 20% • MW-only 61% 63% 64% 59% 61% 62% • Poor 19% 21% 18% 19% 20% 18% MX6.6 03/02 03/03 03/04 03/05 4 days (10 day) • IR+MW 35% 37% 37% 34% 36% 34% • MW-only 50% 47% 44% 50% 47% 51% • Poor 16% 16% 19% 16% 17% 15% MX7.1 - IR+MW50.6 • MW-only 38.9 • Poor 10.4
6.6 7.1 IR + MW pass
MX7.1, MX6.3 and MX5.3 (off-line emulations)Earlier Evaluations with Focus-Day Data sets (e.g. 05/15/2012) CrIMSS IR+MW CrIMSS MW-only MX7.1 Global ALL N=318,000 Yield: IR+MW: 47% MW-only:42% T(p) Bias (K) q(p) RMS (%)