Cubic form factor (20cm/side) with mass < 8kg Pre-deployed antennas and booms Telescope (Blue and Red): 11 Megapixel CCD Aperture = 3cm FOV = 24  30 arcsec/pixel Three-axis attitude control ( ≈1.5 arcminute stability) UHF and S-Band communication. BRITE Satellites. BRITE Satellites.

hateya
Download Presentation

BRITE Satellites

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cubic form factor (20cm/side) with mass < 8kg Pre-deployed antennas and booms Telescope (Blue and Red): 11 Megapixel CCD Aperture = 3cm FOV = 24 30 arcsec/pixel Three-axis attitude control (≈1.5 arcminute stability) UHF and S-Band communication BRITE Satellites

  2. BRITE Satellites

  3. BRITE Satellites

  4. BRITE Satellites

  5. BRITE Instruments - Telescopes 5 lens system plus filter & baffle RED design BLUE design 24 deg FOV, telecentric low distortion, minimal vignetting

  6. BRITE Detectors KODAKKA11002 good performance at high (+20C) temperatures low power consumption and reasonable price ReadNoise ~15e rms

  7. BRITE - Filters

  8. BRITE – Point Spread Function ZEMAX Model PSF - 5 deg offsets BRITE Blue 0.50 0.73 1.07 1.29 0.83 0.61 0.52 +0.3 +0.2 +0.1 0.0 -0.2 -0.3 -0.1 red: rms scatter in mmag black: CCD distance in [mm] design best focus extra focal intra focal

  9. BRITE Point Spread Function BRITE Blue PSF 5 deg offsets 8 pixels diameter – 80 pixels carry signal~30“/pixel

  10. BRITE – Field Of View 30“/pixel 2670 pixel 4000 pixel

  11. Region of Interest ROI/Raster up to 15 (32x32pixel) ROI/Raster

  12. BRITE Onboard Data Processing

  13. ROI Rnnn X2 Y2 RnnnB2 RnnnB3 RnnnA2 RnnA1 V pix BW pix RnnnB4 RnnnB1 BW pix H pix Y1 X1 BRITE Onboard Data Processing sections: RnnnB1-4 ... backgrounds RnnnA1-2 ... apertures processed data: for each background median and sigma are calculated + the sum of signals values encompassed in the two apertures a total of 10 values BW ... width of background [pixels]

  14. BRITE Photometric Performance mag(V) mag(V) = 0-> 1.3 sec / 14 exp per min scatter mag(V) = 2-> 8.0 sec / 5 exp per min mag(V) = 4-> 50.0 sec / 1 exp per min

  15. BRITE Orbit UniBRITEand BRITE-AUSTRIA will be launched on the same rocket into: • Low Earth Sun-Synchronous Dawn Dusk Orbit • 820 km, LTDN 6am • orbit period ~ 101min SUN

  16. BRITE Launcher Madras

  17. BRITE Ground Stations • Primary Ground Station: IKS – TU Graz • Additional Locations: UTIAS – Toronto Canada TU Wien IfA Uni Wien Minimum Data Rate 2MB per day

  18. BRITE Target Stars • 40 proposals have been submitted • 13 PI‘s and their teams • Austria (13), Australia (1), • Belgium (2), Bulgaria (1), • Canada (4), Croatia (1), • Germany (6), Iran (1), Poland (2), • Spain (1), Switzerland (1), U.K. (3) and USA (3) • O, B and Be stars, beta Cephei stars, hot Supergiants, • delta Scuti variables, gamma Doradus pulsators, • roAp / CP stars, red Giants , eclipsing binaries and more BRITE CANDIDATE TARGET STAR CATALOG BRITE-sky: a target fields evaluations tool

  19. BRITE AO-I Overview • the first announcement of opportunity • was released in Sep 2008 – deadline Nov 2008 • an initial review of the proposals was carried • out in Dec 2008 • proposers were given a chance to supplement • their target star lists and assign weights to objects • deadline Feb 2009 • finally we got 42 proposals with more than 6000 • candidate targets

  20. BRITE AO-I Proposals Overview • 42 proposals have been submitted • PIs from 13 countries • Austria (14), Australia (1), • Belgium (2), Bulgaria (1), • Canada (4), Croatia (1), • Germany (6), Iran (1), Poland (2), • Spain (1), Switzerland (1), U.K. (3) and USA (3) • O, B and Be stars, beta Cephei stars, hot Supergiants, • delta Scuti variables, gamma Doradus pulsators, • roAp / CP stars, red Giants , eclipsing binaries and more BRITE TARGET STAR CATALOG

  21. BRITE Targets Evaluation • weight individual stars in proposals • weight the scientific merit of each proposal • calculate the weighted density of stars accross the sky • select the fields with highest density which are seperate properly in RA • invesigate fields that are observable all year BRITE_sky : BRITE Targets Display and Field Investigation Tool

  22. BRITE Targets Evaluation • four commissioning fields were tentatively selected by BEST in June 2009 • criteria were: distribution in RA to cover all seasons real time access to ground stations potential scientifc content cf1 RA= 5.5h DEC= 0.0d (Orion) cf2 RA=10.8h DEC= +11.7d (Leo) cf3 RA=15.9h DEC= 0.0d (Ser) cf4 RA=22.0h DEC= +60.5d (Cep)

  23. BRITE Commissioning Fields • 40 proposals have been submitted • 13 PI‘s and their teams • Austria (13), Australia (1), • Belgium (2), Bulgaria (1), • Canada (4), Croatia (1), • Germany (6), Iran (1), Poland (2), • Spain (1), Switzerland (1), U.K. (3) and USA (3) • O, B and Be stars, beta Cephei stars, hot Supergiants, • delta Scuti variables, gamma Doradus pulsators, • roAp / CP stars, red Giants , eclipsing binaries and more BRITE CANDIDATE TARGET STAR CATALOG BRITE-sky: a target fields evaluations tool

  24. maximize output of mission required 15min observations of one field/orbit the orbit period will be ~101min observing one of more fields per orbit data volume needs to be in check BRITE Observing Strategy

  25. BRITE Observing Strategy Considerations for one pair of (Blue-Red) Satellites Launch Field 1 Field 1 Field 2 Field 2 Field 3 – all year access ~100min Year 1 Year 2 comm 2m

  26. BRITE Observing Strategy shared orbit observations Star Field 1 Star Field 2

  27. Star Field 1 Star Field 2 BRITE Observing Strategy 1 orbit (~101min)

  28. BRITE Project Status • Hardware development to be completed by Dec 2010 • Completion of the two satellites in March-2011 • Launch is schedule for June 2011 http://www.brite-constellation.at