40 likes | 191 Views
LHC Injection in 07 “Planning”. Milorad Popovic. Outlook. General Remarks, Visits Gianluigi Arduini, Feb-11 Heiko Damerau before PAC07 Elias Metral after PAC07 ??
E N D
LHC Injection in 07“Planning” Milorad Popovic
Outlook • General Remarks, Visits • Gianluigi Arduini, Feb-11 • Heiko Damerau before PAC07 • Elias Metral after PAC07 ?? • Finally, we had another MD on the longitudinal blow-up (last day of the machine run), where we could first demonstrate that it can also be performed by our 80 MHz RF system. The observed increase of the bunch length is almost perfectly consistent with what has been predicted by ESME before. • Linac Debuncher Phase? • PSBooster • PS • SuperPS
From one of last e-mails • ….Finally, we had another MD on the longitudinal blow-up (last day of the machine run), where we could first demonstrate that it can also be performed by our 80 MHz RF system. The observed increase of the bunch length is almost perfectly consistent with what has been predicted by ESME before.
Longitudinal Emittance Blow-up in the PS H. Damerau Acknowledgments: W. Höfle, T. Linnecar, A. Marmillon, M. Morvillo, M. Popovic (FNAL), E. Shaposhnikova, J. Tückmantel, J.-L. Vallet Accelerator Performance Committee 08 December 2006