RAJASTHAN STATE ROAD DEVELOPMENT CONSTRUCTION & CORPORATION L TD . JAIPUR. MANGALWAR – NIMBAHERA (MDR-11A). Development of Project on BOT (Annuity) Model. PROJECT LOCATION. PROJECT LOCATION. NECESSITY.

havily
Download Presentation

MANGALWAR – NIMBAHERA (MDR-11A)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAJASTHAN STATE ROAD DEVELOPMENT CONSTRUCTION & CORPORATION LTD. JAIPUR MANGALWAR – NIMBAHERA (MDR-11A) Development of Project on BOT (Annuity) Model

  2. PROJECT LOCATION

  3. PROJECT LOCATION

  4. NECESSITY • Better access to Stones mines of the area to rest of State. • Better roads for transportation of materials to & from Cement plants i.e. J.K.Cement-Nimbahera, Birla Cement, Vikram Cement, etc. established in the region providing better opportunity for their expansion. • Comfortable present connectivity between Mangalwar and Nimbahera via Nikumbh which is the shortest route to connect Kandla Port to Central India (M.P.) like Indore and Ratlam, Bhopal etc. • Road, if improved shall form life line of Badi Sadri & Nimbahera Assembly Constituency which is spread from Mangalwar to Nimbahera. • Improved Business activities shall further the cause of economic and social advancement of the area. • Shall provide a link from NH 79 to NH 76.

  5. NECESSITY • Mangalwar & Nimbahera are the Busy towns and they need faster & effective connectivity by Road. • Commercial traffic is available due to Cement Production & other Industrial activities • Number of Sharp Horizontal & Vertical Curves has be redesigned as per Guidelines of IRC. • Widening & Strengthening of Carriageway from 1.5 Lane to 2 Lane with Hard Shoulder is required. • This road is existing Toll Road and the concession period is ending by March 2012. The Concessionaire is RSRDCC.

  6. Project Proposal • 2 Lane Carriageway with Hard Shoulder is Proposed. • Chikdra & Minana Bye Pass is proposed of approx. 4.25 km. • Widening of Culverts to 12.0m ROW. • All Horizontal & Vertical Curves shall be designed as per designated speed with all the requirements of Highway Design and make them correct. • Paved Shoulder after 14 years.

  7. Bye Pass at chikadra required

  8. Bye Pass at MInana required

  9. MANGALWAR JUNCTION

  10. Nimbahera Town

  11. EXISTING SCENARIO(DETAILS OF CARRIAGEWAY)

  12. EXISTING SCENARIO(DETAILS OF HABITATIONS) No Level Crossing is on the route.

  13. PROPOSAL FOR ROAD IMPROVEMENT

  14. PROPOSED ROAD CROSS SECTIONS

  15. PROPOSED ROAD CROSS SECTIONS

  16. STRIP PLAN

  17. estimates

  18. ABSTRACT OF COST OF DEVELOPMENT (WITHOUT PAVED SHOULDER)

  19. ABSTRACT OF COST OF DEVELOPMENT

  20. ABSTRACT OF COST OF MAJOR MAINTENANCE

  21. FINANCIAL ANALYSIS

  22. Traffic Scenario(7 Days CVC 21/05/10 to 28/05/10)

  23. %age of Tollable Traffic Assumed traffic growth per year 5%

  24. Tollable Routes

  25. Tollable Traffic

  26. TOLL PLAZA LOCATIONS

  27. Summary of proposal • Construction Period – 1 Years 0 Months • Repayment Period – 19 Years 0 Months • Concession Period – 20 Year 0 Months • Annuity Model with Toll • Annuity – 4.50 Crores

  28. SUMMARY OF PROJECT

  29. Models of PPP Annuity with toll

  30. RECOMMENDATION • Annuity Model with Toll Collection shall be adopted. • Toll Shall not be charged by Car & Public Transport. Only Commercial Vehicles like LCV’s , Trucks shall be charged. • Initially 2 Lane road without paved shoulder. • 2 Lane with Paved Shoulder shall be after 14 Years. • Construction Period – 1 Years 0 Months Repayment Period – 19 Years 0 Months Concession Period – 20 Year 0 Months

  31. THANKS 43

  32. Models of PPP BOT 30% VGF (20% Central + 10% - O&M - State Govt.)

  33. Tollable Traffic - Comparison

  34. DETAILS OF PROPOSED WORK & DEFECT LIABILITY PERIOD