1 / 4

Program Name

UNCLASSIFIED. Program Name. Decisional / Informational (select one). Document Name Date Briefer / Code. UNCLASSIFIED. BLUF (Bottom Line up front). Informational / Decisional Signature Needed Message Release Et cetera. Basic Information. ACAT Level DOT&E Oversight

havily
Download Presentation

Program Name

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. UNCLASSIFIED Program Name Decisional / Informational (select one) Document Name Date Briefer / Code UNCLASSIFIED

  2. BLUF (Bottom Line up front) • Informational / Decisional • Signature Needed • Message Release • Et cetera

  3. Basic Information • ACAT Level • DOT&E Oversight • Testing Stage (ie. Pre-Milestone C) • OTD/OTC Names • PMA-XXX • MDA • Prime Contractor • Operational Test Activity (ie. VX-1) • If a Joint Program, who is the Lead OTA? • Other pertinent programmatic information • Is Program developing an OT Framework? • Is Program conducting IT?

  4. Continue PPT brief as you see fit for your program / issues. • For final report briefs, include • summary of COI resolutions with summary of risks/deficiencies under each COI. • Changes from E-SERB results (ie, added OPCON or deficiency/risk change with rationale) • Effectiveness Suitability determination • Overall recommendation

More Related