600 likes | 848 Views
Conservation Data & Information:. Texas Water Development Board Planning and Conservation Efforts. Conservation Vanessa Escobar Cameron Turner John Sutton. Water Resources Planning Tom Barnett Kevin Kluge Erin McAuley Doug Shaw. For Water Conservation Advisory Council
E N D
Conservation Data & Information: Texas Water Development Board Planning and Conservation Efforts Conservation Vanessa Escobar Cameron Turner John Sutton Water Resources Planning Tom Barnett Kevin Kluge Erin McAuley Doug Shaw For Water Conservation Advisory Council April 20, 2011
Conservation Efforts & Planning Efforts • Data & Information Overview • Separate & Overlapping functions • Identify Key Reporting Vehicles • How Information is being used
Board Members TWDB Executive Administration Operations & Administration Finance Construction Assistance Project Finance Water Science & Conservation Water Resources Planning & Information
Water Science & Conservation Conservation Water Resources Planning Water Resources Planning & Information Surface Water Groundwater Flood Planning Innovative Water Technology TNRIS (Texas Natural Resource Information System) Agricultural Conservation Irrigation Water Use estimates Metering Reports Ag Grant Program Municipal Conservation Conservation Plans Annual Reports Water Loss Audits Education Best Management Practices Water IQ School Educational Resources Regional Water Planning Regional Planning Process Stakeholder Liaison State Water Plan Water Supply and Strategy Analysis Database Information Economic & Demographic Research State and Regional Estimates State and Regional Projections Water Use Surveys & Estimates Water Use Estimates GPCD
Water Demand Projections (acft) 2012 State Water Plan Data
Water supply needs by water use category for 2010-2060. Projected Supply -Projected Demand = Projected Needs Texas Water Development Board
Agricultural Water Use: Estimates and Projections Cameron Turner Agricultural Water Conservation Doug Shaw Water Planning Research and Analysis
Annual Irrigation Estimates • Evapo- • transpiration (ET) • USDA-Farm • Service Agency • (FSA) • Groundwater • Conservation • Districts • TCEQ
TWDB Crop Categories • Cotton • Sorghum • Corn • Rice • Wheat • Other Grain • Forage, Hay & Pasture • Peanuts • Soybeans and Other Oil Crops • Vineyard • Orchard • Alfalfa • Sugarcane • Vegetables • Other Crops
Irrigation Estimates by Crop Type Estimated Crop Water Need (in/ac) Effective Rainfall = (Reference ET x Crop Coefficient) -
Estimated Crop Water Use Crop Irrigation Water Use Estimated Crop Water Need (in/acre) Irrigated Crop Acres = x
Draft Irrigation Estimates Comments and Revisions Example: 2009 irrigation estimates for Carson County with revised irrigation rates and acre-feet according to Panhandle GCD comments.
Projections for the 2012 State Water Plan Figure 2.2 – Projected Water Demands (acre-feet/year) Taken from “Water for Texas: Summary of 2011 Regional Water Plans”
Livestock Water Use Although Livestock Water Use represents a small portion of Total Water Use in the State, We are all very aware of how important the livestock industry is to the State of Texas, it’s history and it’s future.
Livestock Water Use TWDB Staff calculates annual Livestock water use for each County by gathering Livestock population data from Texas Agriculture Statistics Service (TASS) and Applying livestock water use coefficients. Livestock Water Use Coefficients (gallons/day) • Dairy Cattle: 75 • Cattle: 15 • Hogs: 11 • Sheep: 2 • Goats: .5 • Horses: 12 • Laying Hens: 90/1,000 birds • Broilers: 15/1,000 birds
Municipal Water Use: Plans, Audits,& Reports John Sutton Municipal Water Conservation Erin McAuley Water Planning Research and Analysis
Conservation & Planning Reporting Requirements Required by TWDB or TCEQ for many utilities: Water conservation plans Utility Profile Annual reports Water loss surveys 5-year implementation reports Drought contingency plans Water Use Survey Purpose: Water conservation is a critical element to meeting the State's long-term water needs For water utilities and their customers, conservation programs are often more economical because they can postpone or eliminate the need for new infrastructure
TCEQ TWDB
Water Conservation Plans Water Conservation Plan (WCP), 31 TAC Chapter 363, Subchapter A, Rule 363.15 The purpose of a WCP is to establish specific and quantified 5- and 10-year goals for water use. The WCP should establish a schedule for achieving those targets and goals, establish a method of tracking progress, and establish a water rate structure which is cost-based and which does not encourage the excessive use of water.
Utility Profile ~ is part of WCP Evaluates water and wastewater systems Identifies customer use characteristics, water conservation opportunities, and potential targets and goals. Assists with water conservation plan development and ensures that important information and data is considered when preparing the water conservation plan and its target and goals. Information includes: population served number of connections water supply system data history of water use waste water system data
Water Conservation Plans • Applicable to Entities With • TWDB loans greater than $500,000 • Surface water right through TCEQ • 3,300 or more connections • Components • WCP should contain long-term elements such as ongoing education activities, metering, water accounting and estimated water savings from water reuse and recycling activities, leak detection and repair and other conservation activities. • Utility Profile • Targets & Goals • GPCD & Water Loss • Minimum Requirements • Non-promotional Rates • Education & Outreach • Drought Contingency Plan • Other Checklist Requirements • Frequency • Every 5 years
Annual Reports • Water Conservation Annual Report (AR), 31 TAC Chapter 363, Subchapter A, Rule 363.15(g) • An Annual Report is required from each entity that submits a WCP. The Annual Report shall report annual progress in implementing each of the minimum requirements in the WCP. As the report form is completed an entity should review their WCP to see if they are making progress towards meeting stated goals. • *5year –Implementation Reports prepared for the TCEQ providing the required information may be submitted to the TWDB to fulfill this reporting requirement.
Annual Reports • Applicable to Entities with • TWDB loans greater than $500,000 • 3,300 or more connections • Surface water right through TCEQ • * Anyone with a requirement to have a Water Conservation Plan • Components • The Annual Report collects utility data on: • Targets and Goals • GPCD • Water Savings • Water Loss • Educational Programs • Rebate & Retrofit Programs • Rate Structures • Metering & Meter Repairs • Frequency • Due annually by May 1
5 - year Implementation Report TCEQ 5-year Implementation Report, 30 TAC Chapter 288, Subchapter B A water conservation plan is required from each entity with a non-irrigation surface water right greater than 1,000 ac-ft/yr or an irrigation surface water right greater than 10,000 ac-ft/yr through TCEQ. The 5-year Implementation Report shall summarize the annual progress in implementing the 5-year goals in the WCP. Submit to TCEQ by May 1, 2014, and every five years thereafter.
Water Loss Survey Water Loss Survey, 31 TAC Chapter 358, Subchapter B, Rule 358.6 The purpose of a Water Loss Survey is to help conserve the state’s water resources by reducing water loss occurring in the systems of drinking water utilities. A Water Loss Survey is required by all retail water utilities.
Water Loss Survey The TWDB Water Audit Worksheet is a "top down" audit and is referred to as a "desktop" exercise using existing estimations and records. Data is used in TWDB loan applications and in regional water planning studies. Assists the utility to improve their delivery system and to reduce revenue losses. Due to TWDB by March 31, 2011, and every five years thereafter.
Drought Contingency Plans • Drought Contingency Plan (DCP), 30 TAC Chapter 288, Subchapter B • All wholesale public water suppliers, retail public water suppliers serving 3,300 or more connections, and irrigation districts must submit a DCP. Retail public water suppliers serving less than 3,300 connections must prepare and adopt a DCP and make the plan available upon request. • Often times the DCP is a component of the Water Conservation Plan. • Submit DCP to TCEQ by May 1, 2014, and every five years thereafter. • Provide a copy of DCP to Regional Planning Group.
Drought Contingency Plans The Drought Contingency (Emergency Demand Management) Plan is a strategy or combination of strategies for responding to temporary and potentially recurring water supply shortages and other supply emergencies. contains “triggers” to implement levels in required reductions in use of water may include activities that are considered normal water conservation practices
Municipal Water Use Data: Annual Water Uses Survey • Distributed annually to over 4000 public water systems and municipal-type systems
Water Use Survey Water Use Survey, Texas Water Code §16.012 (m) The purpose of the Survey is to gather data to be used for long-term water supply planning. The new online survey can be accessed here: http://www.twdb.state.tx.us/wrpi/wus/online.asp Submit a Water Use Survey to TWDB annually.
Entities Surveyed • Municipal entities that use ground and surface water • City owned systems (1,000) • Water districts (700) • Water supply corporations (750) • Private utilities supplying residential, commercial, and institutional water (1,500) • Mandatory response required by the Texas Water Code
Water Uses Survey: What Information is Collected • Water source information: • Groundwater • Surface water • Reuse • Purchased water • Volume of intake
Water Uses Survey: What Information is Collected • Sales • Wholesale water sales to other systems • Sales to large industrial firms • System information • PWS ID • Population served • Connections by category • Categorized sales volumes: SF, MF, C/I
Water Uses Survey: How the Data is Used • Groundwater pumping volumes used by groundwater conservation districts • Data is used in the regional water planning process • Water demand for municipal and industrial needs are projected out 50 years at the county level
Per-Person Water Use in Planning • Reported annually for cities (>500 population) • Net Water Use • Includes water use of residential, commercial, and institutional users • Includes self-supplied water users inside city • No water sales to large industrial users • No retail water sales to customers outside of city limits • Population • Texas State Data Center July estimates
Accessing WUS Data • Water Uses Survey data is available here: http://www.twdb.state.tx.us/wrpi/wus/2008est/2008wus.asp 4) Residential GPCD is the estimated water use for single family and multi-family residences, expressed on a per capita (population) basis. These estimates, based on responses to questions recently added to the annual water use survey, are being published for the first time. The pilot display of this data should be viewed in the context that, since the reporting of such data had not been historically required, different systems may categorize and report residential water use differently. A dash ( - ) indicates that the primary utility for the city did not report realistic residential volumes in the 2008 survey. No Return - The primary water utility for this city failed to return a 2008 water use survey.
Industrial Water Use: Plans, Audits,& Reports John Sutton Municipal Water Conservation Tom Barnett Water Planning Research and Analysis
Conservation & Planning Reporting Requirements Required by TWDB or TCEQ: Water conservation plans Annual reports 5-year implementation reports Drought contingency plans Water Use Survey Purpose: Water conservation is a very critical element to meeting the State's long-term water needs For industries, conservation programs are often economical because they can reduce operating and production costs, met environmental needs, and play a role in positive marketing.
Distributed each year in January to roughly 2200 industrial facilities: • - Manufacturing Facilities • - Mining Operations • - Steam Electric Plants Industrial Water Data:Annual Water Use Survey
Industrial Water Use Survey: What We Ask For • In addition to basic system and water source information: • 1. NAICS code – North American Industrial Classification System • 2. Number of employees • 3. Sales to other facilities • 4. Electric power generation