LASCO BATHWARE

LASCO BATHWARE. Lean Six Sigma Project. by Darryl and Jack. Title. 1: Discuss why the project was completed. The primary pilot project objectives were to (page ES1)

hayley
Download Presentation

LASCO BATHWARE

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LASCO BATHWARE Lean Six Sigma Project by Darryl and Jack

  2. Title • 1: Discuss why the project was completed. • The primary pilot project objectives were to (page ES1) • 􀂃 Evaluate the benefits and synergies of deliberately integrating environmental considerations into on-the-ground lean practices. • 􀂃 Improve product quality, production efficiency, and product flow in specific areas of the Lasco facility • 􀂃 Gain experience to offer and promote lean and environment projects to manufacturers statewide.

  3. Title • 2: Identify what leadership and Team building methods were used.

  4. Title • 3: Discuss how and what type of customer focus was established.

  5. Title • 4: Identify what costs of quality items were defined and why? • (Chapter 6 Cost of Quality) Page 4- reducing inventory of finished goods (internal Cost of Quality) page 5- Potential product damage on the conveyor and during packaging (internal Cost of Quality) page 6-Reducing variability of resin spray to the units which causes defects and cracking of the finished units (internal Cost of Quality) page 13- eliminated calibration waste by installing in-line flow meters (appraisal cost)

  6. IdentifyWhatProcess Performance measureswereused.

  7. Title • Identify what DMAIC processes were used. • VSM was used to understand the largest sources of lean manufacturing and environmental wastes, and to identify three improvement projects. There was also a DOE done to address spray variability. This involved extensive data collection to determine how to best measure and reduce resin fluctuation and final unit weights. clearly there was a lot of data that was collected, but did not say how it was analyzed. There are a lot of examples of improvement, and even some examples of control (5s score cards) but again not a lot of detail on what type of charts were used to quantify the data.

  8. Title • 7: Discuss what process Improvement tools where used such as Value-Added Process Mapping,Just-in-Time, 5S, Kaizen, Work Optimization and Productive Maintenance.

  9. Title Discuss what variation reduction tool were used such as control Charts, Capability studies, Reliability studies and Design of Experiments. There was also a DOE done to address spray variability. This involved extensive data collection to determine how to best measure and reduce resin fluctuation and final unit weights. TPM total productive maintenance.