180 likes | 308 Views
Lake Pontchartrain Water Quality Monitoring March – May 2008 Bonnet Carre Spillway Opening. Andrea Bourgeois-Calvin Program Coordinator Bonnet Carre Workshop June 13, 2008. LPBF Basin-wide Water Quality Monitoring Program. Began January 2001 Three Objectives
E N D
Lake Pontchartrain Water Quality Monitoring March – May 2008Bonnet Carre Spillway Opening Andrea Bourgeois-Calvin Program Coordinator Bonnet Carre Workshop June 13, 2008
LPBF Basin-wide Water Quality Monitoring Program Began January 2001 Three Objectives Distribute water quality information to the public Identify pollution sources Provide data to research community and government agencies at all levels
Monitoring Sites and Parameters • Monitor recreation sites around Lake Pontchartrain Basin for • * Water Temperature • * Dissolved Oxygen • * Specific Conductance • * Salinity • * pH • * Turbidity • * Fecal Coliform • * Enterococci • Data released to media
Spillway Time-Line • Spillway opened on April 11, 2008 • Spillway closed April 30 – May 8, 2008 • Algae blooms first sited- mid-May in Lake Maurepas, Pass Manchac, and off Tchefuncte River. Tchefuncte River, May 26, 2008 Lewisberg, May 19, 2008
Conclusions Salinity • Immediate and sustained drop in salinity on southshore • Later drop in salinity on northshore Fecal Coliform • Fecal coliform levels remained consistent on both shores Turbidity • Turbidity spiked on southshore with opening of spillway • Turbidity spiked on northshore with winds blowing from south and beginning of algae blooms in mid-May Dissolved Oxygen • Dissolved oxygen levels consistently high on southshore • Dissolved oxygen levels decreasing on northshore with growth of algae blooms (since mid-May and continuing to current)