320 likes | 492 Views
Lakeside Project. Utah Abandoned Mine Reclamation Program. Division of Oil, Gas & Mining Department of Natural Resources. Purpose : To seal hazardous abandoned mines. Abandoned Mine Hazards. Roof collapse Unstable side walls Total darkness – you can easily get lost
E N D
Lakeside Project Utah Abandoned Mine Reclamation Program Division of Oil, Gas & Mining Department of Natural Resources
Abandoned Mine Hazards • Roof collapse • Unstable side walls • Total darkness – you can easily get lost • Hidden vertical shafts inside • Toxic gases • Lack of oxygen
Project would close: • 14 portals • 19 shafts • Affect <5 acres
Right of Entry (ROE) • Permission is obtained from all land owners prior to any construction work • Private land • Public (Bureau of Land Management) • State Trust Lands (minerals) • Private (Surface)
Legal Authority • Utah has primacy under the Surface Mining Control and Reclamation Act of 1977, SMCRA
Project Costs • Funded by a tax on current coal production
Project Selection • Ranking priority system considers: • Population: Resident and Transient • Mining Districts: historic mining areas • Mine density • Roads and accessibility
Project Schedule • Work would occur in late summer/fall of 2008 • Work would require 4 weeks
Some of the laws we comply with: • National Environmental Policy Act NEPA • National Historic Preservation Act • Antiquities Act • Endangered Species Act
Environmental Assessment • Analyzes potential impacts on the environment • Includes clearances from: • State Historic Preservation Officer • US Fish and Wildlife Service • Sign-offs from: • Office of Surface Mining • Bureau of Land Management
Surveys & Data Collection • Abandoned Mine Inventory • Cultural & Historical Surveys • Bat Surveys • Paleontological Surveys (not applicable for Lakeside Project)
Historical and Cultural Inventory House Foundation
AMRP’s Intent • Cause the least amount of disturbance possible • Design mine closures so that historical features are preserved • Revegetate all areas disturbed
Bat Gates Locked steel gates allow for access and bat usage
Closure # Avg. Costs • Machine Backfill 21 <$10/CY • Hand Backfill 5 ~$100/CY • Block Wall 1 ~$40/SF • Stone Wall 0 ~$40/SF • Bat Gate 1 ~$75/SF • Grade Beam Grate 1 ~$50/SF • Pinned Grate 4 ~$45/SF • PUF 0 ~$450/CY • Compound Custom 0 varies
Public Participation • What are your concerns? • Please give us your comments. • Contacts: Chris Rohrer or Connie Jo Garcia EA Coordinator Project Manager 801-538-5322 801-538-5347 chrisrohrer@utah.govconniegarcia@utah.gov