1 / 3

CIS 436 Your Dreams Our Mission/uophelp.com

CIS 436 Week 10 Assignment 2 XYZ Company Troubleshooting and Maintenance Plan<br><br>For more course tutorials visit<br>www.uophelp.com<br><br><br><br>Assignment 2: XYZ Company Troubleshooting and Maintenance Plan<br>Due Week 10 and worth 170 points<br>Use the same scenario from Assignment 1. In addition, XYZ Company is heavily invested in e-Commerce with all retail locations’ Point of Sale systems connected so that it maintains a dynamic inventory and automatically generates restock orders. The XYZ Company engineers have configured the WAN-based Intranet using IPSec to support all of these locations via encrypted VPN links connected to the nearest regional distribution center.<br>XYZ Company has an enterprise network consisting of a core backbone, corporate campus, two (2) data centers, regional distribution centers, and Internet Edge with a DMZ. For better security, the retail Point of Sale systems does not have direct Internet access. At the corporate campus, the seven (7) departments in the company include Finance, Operations, Human Resources, Sales,

Download Presentation

CIS 436 Your Dreams Our Mission/uophelp.com

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CIS 436 Your Dreams Our Mission/uophelp.com For more course tutorials visit www.uophelp.com

  2. CIS 436 Your Dreams Our Mission/uophelp.com CIS 436 Week 10 Assignment 2 XYZ Company Troubleshooting and Maintenance Plan For more course tutorials visit www.uophelp.com Assignment 2: XYZ Company Troubleshooting and Maintenance Plan Due Week 10 and worth 170 points Use the same scenario from Assignment 1. In addition, XYZ Company is heavily invested in e-Commerce with all retail locations’ Point of Sale systems connected so that it maintains a dynamic inventory and automatically generates restock orders. The XYZ Company engineers have configured the WAN-based Intranet using IPSec to support all of these locations via encrypted VPN links connected to the nearest regional distribution center.

  3. CIS 436 Your Dreams Our Mission/uophelp.com For more course tutorials visit www.uophelp.com

More Related