1 / 21

“LOWER DANUBE GREEN CORRIDOR – Last 10 Years”

This presentation discusses the background and main aims of the Lower Danube Green Corridor (LDGC) project. It highlights the impact and benefits of the project for the region, including the protection and restoration of floodplain habitats along the Danube River. The presentation also outlines the major goals and steps for implementing the LDGC in Bulgaria, including the development of a strategy and action plan for the protection and restoration of floodplain forests. The presentation emphasizes the importance of collaboration and cooperation among Bulgaria, Romania, Ukraine, and Moldova in creating and maintaining the LDGC.

hdawson
Download Presentation

“LOWER DANUBE GREEN CORRIDOR – Last 10 Years”

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. “LOWER DANUBE GREEN CORRIDOR – Last 10 Years” Dr. Meglena PLUGTSCHIEVA- Member of Parliament, National Assembly of the Republic of Bulgaria

  2. Map of the Danube Region

  3. Map of the LowerDanube

  4. Bulgaria has a long stretch of the globally important lower Danube/471 km./

  5. Structure of the Presentation • Background • Main aims and activities of the LDGC project • Impact and benefits from the LDGC project for the region

  6. THE BACKGROUND • 1991: Establishment of first contacts with WWF-Auen Institut in Rastatt /Germany/ and the involvement of Bulgaria in the Green Danube Project • 1991- 1996: Implementation of the Green Danube Project for protection and restoration of floodplain forests /WWF-Auen-Institut in Rastatt, Germany, and the Committee on Forests of the Republic of Bulgaria/ • April - May 1999: Expert level meeting in Tulcea. Representatives of Bulgaria, Romania, Ukraine and Moldova discussed the basic concept for designation of LDGC. The Danube Pollution Reduction Programme issued a report, prepared by WWF DCPO and the WWF-Germany Auen Institut: Evaluation of Wetlands and Floodplain Areas in the Danube River Basin. The report identified priority wetlands for restoration. • 1999 - 2000: First procedures for designation of new protected areas along Danube islands and the floodplains on the Danube bank. • June 2000: Summit in Bucharest, LDGC agreement signed between the ministers of environment of Bulgaria, Romania, Ukraine and Moldova

  7. LDGC – Major Goals IUnder the LDGC agreement from the Summit in Bucharest, June 2000 • to take concerted action to create a Lower Danube Green Corridor that will expand the cooperation and coordination between Bulgaria, Moldova, Romania and Ukraine • the countries will establish the Lower Danube Green Corridor composed of a minimum commitment of 773.166 ha of existing protected areas, 160.626 ha of proposed new protected areas, and 223.608 ha areas proposed to be restored to natural floodplain • each country will prepare an action plan that designate additional areas of floodplain that will be protected and restored. • to take all suitable measures to ensure the protection of the Lower Danube Green Corridor wetlands and floodplain habitat • organize a regular exchange of information in order to achieve effective protection of the Lower Danube Green Corridor

  8. LDGC – Major Goals IIUnder the LDGC agreement from the Summit in Bucharest, June 2000 • to recognize the crucial role of environmental Non-Governmental Organisations in the expression of public interests and ideas in a democratic framework and to offer citizens and environmental NGOs the opportunity to play an active role in decision making processes. • To seek partners locally and nationally as well as internationally and Governments in order to co-operate and assist in the creation and maintenance of a Lower Danube Green Corridor • To take efforts to develop economic instruments which contribute to the reduction of the costs from pollution polluter pays principle) and to promote sustainable development and ecological imperatives in sectorial policies and in mobilizing national funds for environment and other ways for private and public financing. • To present the Lower Danube Green Corridor as a Gift to the Earth as part of the WWF Living Planet Campaign which is aimed to secure the conservation of the world’s most important biological resources and ecosystems into the next millennium.

  9. Major steps for implementation of LDGC in Bulgaria • Strategy for the protection and restoration of floodplain forests on the Bulgarian Danube islands – 2001 has been prepared and adopted /75 Bulgarian islands with total area amounting to 10.700 ha/ • Action Plan for the implementation of the LDGC in Bulgaria – 2003 -2007 • Major Projects and Initiatives

  10. THE STRATEGY • Strategic framework for the sustainable management of the Bulgarian Danube islands over a period of 30 years • Based on inter-institutional cooperation • Defines integrated management goals for biodiversity conservation, socio-economic development and environmental improvement • Conservation of existing natural floodplain forest communities on the Danube islands • Increasing of the area of floodplain forests of native species on the Danube islands • Protection and restoration of habitats of rare, threatened and economically important species, including fish spawning sites • Extension and strengthening of the protected areas network on the Danube islands • Raising of public and institutional awareness and support

  11. THE ACTION PLAN 2003 - 2008Development and implementation of management plans for priority protected areas • Srebarna Nature Reserve -396 ha (2001-2006) • RoussenskiLom Nature Park- 3408 ha (2002-2006) • Persina Nature Park- 21.700 ha (2004-2006) • Kalimok -Brashlain Protected Site- 6000 ha (2004-2006) Restoration of Wetlands and Floodplain Habitats • Kalimok Wetlands – 2,000 ha (2006) • Persina Wetlands – 800 ha (2006) • Danube islands’ floodplain forests – 300 ha (2002-2006)

  12. THE ACTION PLAN 2003 - 2008Institutional Capacity Building • Establishment of Persina NP Directorate (2001-2002) • Development and implementation of a management model for Kalimok Site (2002-2003) • Training and equipment for Protected Areas management staff (2001-2006) Public Awareness Raising • Development and implementation of a Communications Strategy for the LDGC (2001-2002) • Publishing of promotion materials • Establishment of Stakeholder Panels at Sites of Conservation Importance (2001-2002) • Travelling exhibition in the Danube municipalities (2001-2002)

  13. Major Projects and InitiativesI • GEF/World Bankwetland restorationand pollution reduction project 2003-2008 (covering major part of the activities in the action plan; total project cost – 13,8 million USD) PROJECT COMPONENTS Wetland Restoration, the most innovative activity, with high replication value, at two proposed sites: Kalimok Marshes and the Belene complex. Water Quality Monitoring up- and downstream from the demonstration sites to determine the improvement achieved relative to expectations. Anticipated biodiversity improvements will also be monitored.

  14. Major Projects and InitiativesIIGEF/World Bankwetland restorationand pollution reduction project 2003-2008 - Activities to Ensure Long -Term Sustainability, including strategies for sustainable use of the wetlands: harvesting of bio-mass; revitalization of fisheries; tourism based on the natural attractions; - Public Awareness campaigns to enhance the understanding of the public of the importance of wetlands for Bulgaria’s natural heritage and for a variety of other environmental services vital to Bulgaria’s wealth. - Training for staff at the national and local levels in wetland restoration and management.

  15. Major Projects and InitiativesIII • Green borders Project under the EU LIFE Program - Cross-border project between Bulgaria, Romania and WWF for Protection of the habitats of endangered species of international importancesuch as:Pelecanus crispus, Pygmy Cormorant /Phalacrocorax pygmeus/ and Ferruginous Duck / Aythya nyroca /. Timetable 2009-2012. • Protection and restoration of natural river flowsin Bulgaria with the support of MAVA Switzerrland, DOEN Holland, DBU Germany and WWF. The project aims to recover the old river beds and the natural river dynamics. Timetable 2006-2009 • Protection and restoration of riparian wetlands in Bulgaria, Romania and Ukraine. The projects aims to make model recovery of the wetland zones in Bulgaria, Romania and Ukraine with the support DOEN Holland, WWF Germany and Holland. • Promoting sustainable financing schemes and payments for ecosystem services in the Danube Basin. The project aims to demonstrate the contribution of payments for ecosystem services in sustainable management of natural resources and nature conservation. Timetable 2010-2013.Project partners- WWF Danube-Carpathian program and the support of UNEP GEF and European Commission.

  16. Major Projects and InitiativesIV • Making the network reality: NATURA 2000 and Lower Danube Green Corridor.The project contributes to implementation of the European Union (EU) Habitats and Wild Birds Directives in Romania and Bulgaria by demonstrating participatory management of Natura 2000 sites and related opportunities for socio-economic development of local stakeholders, and feeding this experience into national-level policy making and programming, especially for the mid-term evaluation of rural development, fisheries and the EU Structural and Cohesion Funds.Lessons learned from the project are shared with relevant authorities and stakeholders at national level and across the LDGC, including areas of Moldova and Ukraine. • On the way to new banks and nature conservation in the Lower Danube in Romania and Bulgaria. The projects aims at protecting floodplains areas, restoration of damaged areas, expanding the protected area network, sustainable use of natural resources. Timetable 2006 -2010.Project partners: Bulgaria, Romania and WWF Germany.

  17. Final Conclusions and Results I • Establishment of Strategy andAction Plan for the Protection and Restoration of Floodplain Forests on the Bulgarian Danube Islands. Under the GEF/World Bank Project wetlands and important habitats have been restored within the territory of Persina Nature Park and Kalimok - Brashlian Protected Area with a total area amounting to 3 100 ha. • Extension and strengthening of the protected areas network on the Danube islands. • As an EU member state Bulgaria develops a national ecological network of floodplain areas, a part of the European ecological network NATURA 2000 - 47 protected areas along the river Danube /18 under the Birds Directive and 29 under the Habitats Directive/. The total protected area under NATURA 2000 amounts to 224, 140 ha. • 9 new protected areas have been designated along the Danubewith a total area amounting to 28 400 ha.

  18. Final Conclusions and Results II • Development and implementation of management plans of Srebarna Nature Reserve,Persina Nature Park, Protected Area Kalimok Brushlen, Rusenski Lom Nature Park. • Enhancement of eco-culture and general awareness towards the significance of the eco-systems, biodiversity conservation, green economy and implementation of good practices in agriculture. Benefits: • Global level - reduced transboundary pollution; biodiversity improvement; demonstration value. • Regional level - cross-border cooperation; realization of different projects promoting the development of eco- and rural tourism / Bulgarian-Romanian Association of Ecotourism has been established/.Two Euroregions between Bulgaria and Romania have been established - Lower Danube /2001/ and Ruse-Giurgiu 21 and third Euroregion Danube 21 Millennium /2002/ between Bulgaria, Romania and Serbia • Local level -reduced nutrient pollution;improved fish resource;small business related to bio-mass processing; fish processing; eco-tourism.

  19. Final Conclusions and Results III Bulgaria has largely fulfilled its obligations under the Agreement LDGC outturn in the joint efforts of the governmental institutions and local authorities, non-governmental organizations, cross-border cooperation and the support of the international institutions and organizations

  20. Our Commitment The Danube strategy – new window for opportunities for conservation and sustainable development of the natural recourses in the lower Danube!

  21. Thank you for Your attention!

More Related