Image Quality Upgrade Kickoff Meeting

Image Quality Upgrade Kickoff Meeting. Daniel O’Connor August 6, 2002. GOAL: Make the IRTF a Telescope which is atmosphere seeing limited. Part I. Improve HVAC System (TB) Monitor Dome Environment (DYW) Provide Routine Image Quality Assessment (DOC)

hector
Download Presentation

Image Quality Upgrade Kickoff Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Image Quality Upgrade Kickoff Meeting Daniel O’Connor August 6, 2002

  2. GOAL: Make the IRTF a Telescope which is atmosphere seeing limited

  3. Part I. • Improve HVAC System (TB) • Monitor Dome Environment (DYW) • Provide Routine Image Quality Assessment (DOC) • Characterize Static Optics of Telescope (DOC) • Provide WEB based Documentation (DOC)

  4. Individual Presentations • Tim - HVAC • Darryl – Monitoring System • Miranda – Software, WEB • Dan – all else

  5. HVAC UPGRADE GOAL : To have an operational HVAC system in place, with the capability to set the dome thermal environment to a temperature specified by the operator. That temperature will be based on predictions as to what the outside temperature will be during that evenings observing run.

  6. HVAC : History • Hired consultant to make recommendations. • Recharged refrigeration circuit. • Replaced compressor. • Simplified system circuitry. • Misc. smaller items.

  7. HVAC : Dome Seals • Air infiltration is currently overwhelming the HVAC system. • Dome Skirt • Dome Slit (sides) • Dome Slit (top)

  8. HVAC : Primary Cooling • Makes sense to concentrate cooling effort where it is required the most. • May be possible to utilize coude loop hardware in primary mirror cooling scheme.

  9. HVAC : Misc. High Priority Items • Need to specify, order, install, and calibrate several temperature sensors, and flow meters. • Install air bleeds in coude loop. • Install defrost circuit in coude loop • Install air separator.

  10. HVAC : Medium Priority Items • Implement a control system. • Examine machinery room ventilation. • Determine exhaust tunnel utilization. • Install Expansion Tank • Adjust Dome Louvers

  11. HVAC : Low Priority Items • Overall System Documentation • Emergency Shutdown Procedures • Staff Training

  12. HVAC : Schedule • Blah, blah

  13. HVAC : Schedule

  14. Monitoring Dome Environment The goal is to be able to accurately monitor and record the temperature and humidity of our dome/telescope environment Use existing Johnson Controls temperature and humidity sensors in dome ceiling Install new sensors external to dome, on the telescope, and on primary mirror Warning ‘pop-up’ message on operators screen to notify of potential risk to optics Archive database and make web accessible

  15. Sensors Johnson Controls Sensors Omega PT100 Sensors Vaisala Sensors

  16. Data Monitoring Hardware LakeShore 218E Monitor Omega DP472

  17. 2’ T Internal DomeSensors 20.5’ T 33’ T 33’ H 45.5’ H T 45.5’ T T 2’ 2’ 45.5’ T 33’ H 33’ T 20.5’ T T T 2’

  18. External Dome Sensors H T T

  19. Dome and External Sensor Locations H T T T H T H T T H T T T T T T

  20. Telescope/Mirror temperaturesensor locations T T T T T T T T T T T T T

  21. Dew Point Monitoring Future installment of cooling the primary mirror will put higher risk of dew and frost forming Purchase of a Vaisala HMP243 module and mount near primary Calculate the dew point using our humidity and temperature sensors Warning ‘pop-up’ message on operators screen to notify of potential risk to optics

  22. Data Acquisition Schematic Telescope Mounted Sensors PT100 LakeShore 218E RS232 Digi Portserver #1 Dew Pt. Mon RS232 Network Mirror Mounted Sensors PT100 Telescope LakeShore 218E RS232 J.C. Humidty Sensors Omega DP472 Vaisala Humidity Temp Sensors RS232 AC MODEM MUX MODEM RS232 LakeShore 218E Slip Ring AC Power J.C. Temp Sensors AC MODEM MODEM MUX Dome RS232 Dome Floor Mounted Sensors PT100 LakeShore 218E RS232 RS232 Digi Portserver #2 Network Wind Speed/Direction RS232 Building

  23. Slip Ring

  24. Monitoring and Web Software Miranda Hawarden-Ogata, Albert Fhema • 24 hour monitoring of all dome and telescope sensors, with data to be archived. • GUI to notify telescope operators and IRTF staff of critical environmental changes in the dome. • Static web pages to display the collected dome environment data plots. • Real-time web pages to display current dome environment data. • Interactive web pages to display selected dome environment data.

  25. Monitor System Monitoring Overview Collect Data Filter Data Display for TOs Archive Data Web Display

  26. 2’ T Birds’ eye view of existing sensors 20.5’ T 33’ T 33’ H 45.5’ H T 45.5’ T T 2’ 2’ 45.5’ T 33’ All sensors not mounted on the telescope itself or outside the dome will be displayed on this web page. H 33’ T 20.5’ T T 2’

  27. Sensors mounted on telescope and mirror T T T T All sensors mounted on the telescope itself will be displayed on this web page. Additional information will be displayed at the bottom of the sensor web pages. T T T T T T T T T

  28. 3.) Provide Routine Image Quality Assessment • GOAL: Build an auto-focus system for use with NSFCam and SPeX to provide and automated estimate of focus for the observer, and provide routine assessment of image quality.

  29. 3.) cont. Advantages of Auto-Focus • Observer spends less time focussing • Will focus more often (its easier) • Will provide consistent data on FWHM and Strehl, not subjective

  30. Auto-Focus Schematic NSFCam SPeX HEXAPOD Take Image READ FOCUS WRITE FOCUS HEXAPOD DAEMON IDL Fit Routine Best Fit Focus FWHM, Strehl, Image, Fit Storage IQ Archive GUI

  31. 3.) cont. Focus Update • After A-F working, develop procedure to do Focus Update based on temperature model of telescope truss.

  32. 4.) Characterize Optics of Telescope • Goal: Understand factors in the telescope optics and mirror support system that limit image quality

  33. 4.) cont. TASKS • Hire Optical Consultant • Measure Primary and Secondary Mirrors with interferometric technique • Provide measurement of contribution to error budget • Produce final report

  34. 5.) Provide WEB based Documentation • Integrated WEB site for IQUP • Dedicated page for each sub-project

  35. Schedule / Manpower

More Related