1 / 21

Parkes ATUC Report Nov 2007

Parkes ATUC Report Nov 2007. Stats. Scheduled observing time (2007) 85% Downtime (last 12 months): 1% system faults 3.1% high wind. Observer feedback. 25 reports last 12 months 9.7 for after-hours support 9.4 for quarters comfort - 7.4 for RFI (immunity from).

hector
Download Presentation

Parkes ATUC Report Nov 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Parkes ATUCReportNov 2007

  2. Stats • Scheduled observing time (2007) • 85% • Downtime (last 12 months): • 1% system faults • 3.1% high wind

  3. Observer feedback • 25 reports last 12 months • 9.7 for after-hours support • 9.4 for quarters comfort -7.4 for RFI (immunity from)

  4. From ‘Production and Impact of Radio Telescopes 2001-2005’Trimble & Ceja (2007)

  5. Open Days, Sep 2007 3500 visitors 2000 tower tourists

  6. Receivers • With new 16-26GHz receiver, can cover most of the the spectrum from 1.2 - 26GHz • 20cm multibeam remains state-of-the-art for next 4-5 years (until FPA?)

  7. Receiver developments • Frequency agility - lightweight 18-20cm receiver • use Multibeam only for part of year • upgrade existing H-OH? • 8GHz MARS receiver • Modify conversion to get 1GHz bandwidth • New S/X feedhorn for astrometry/geodesy

  8. Pulsar/transient backends • Pulsar timing • PDFB2 operational (1GHz x 2IF) • PDFB3 coming soon (1GHz x 4IF) • Search mode • APSR coming soon (~8Gb/s BBR) • Search mode for PDFB3 • MBDFB (new 13 beam search engine)

  9. APSR – the Delluge

  10. MBDFB • Collaboration between Swinburne, Berkeley, Manchester, Cagliari, ATNF, Effelsburg • 13-beam filterbank search engine with higher spectral resolution. • Targets; MSPs, transients, relativistic binaries

  11. Still lots out there

  12. Spectral line • Multibeam correlator still the workhorse • 2048 or 4096 channels max for nb > 2 • Up to 16384 channels for single beam • MOPS correlator needed for 16-26GHz receiver – possibly using PDFB3? • s/w correlators possible (using CPSR,PAMELA)

  13. Standing-wave problem • Robert Braun et al. taking a fresh approach. • Use randomised scatterers at aperture blockages

  14. VLBI • Parkes key element in VLBI array • Mark 5b recorder now (almost) working • eVLBI ‘PAMHELA’ on track • 16-26GHz receiver

  15. Mark 5 VLBI recorder

  16. FPA 12m testbed antenna

  17. The price of flexibility – more automation of routine configurations

  18. Unattended operation? • Completely unattended operation may leave ATNF exposed • DCP within 1km, possibly asleep; • Maintaining observer vigilance • Remote monitoring, including fire alarms • Odd noises – early intervention

  19. For the chop • AT correlator • WBC (Wideband pulsar correlator) • Mark3A VLBI recorder • S2 VLBI recorder • PDFB1 lifetime is limited • Pulsar analogue f/b ditto (post-MBDFB)

More Related