100 likes | 237 Views
Comparison of the Operating Reserve Demand Curve Augmentations. John Dumas Director of Wholesale Market Operations RATF March 24, 2014. Impact on ORDC with various proposals. Impact on Peaker Net Margin (PNM) on 1/6/2014 and 3/3/2014(in $/MW-year):. Original Ps PNM $2,158.52/MW-year
E N D
Comparison of the Operating Reserve Demand Curve Augmentations John Dumas Director of Wholesale Market Operations RATF March 24, 2014
Impact on ORDC with various proposals • Impact on Peaker Net Margin (PNM) on 1/6/2014 and 3/3/2014(in $/MW-year):
Original Ps PNM $2,158.52/MW-year Ps with SD added $5,953.63/MW-year PS with 500 MW added $3,129.38/MW-year
Original Ps PNM $2,158.52 /MW-year Ps with RUC HSL pulled $3,127.62 /MW-year
Original Ps PNM $644.71/MW-year Ps with SD added $3,510.95/MW-year PS with 500 MW added $1,314.77/MW-year
Original Ps PNM $644.71/MW-year Ps with RUC HSL pulled $6,609.93/MW-year