An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. วิชาการเป็นเลิศเชิดชูคุณธรรม ผู้นำ Merchant Marine Training Centre

  2. Starting a Marine Diesel Engine • Merchant Marine Training Centre

  3. Indicator cocks Jacket Cooling Water

  4. Warming ThroughMain engines have to be warmed through slowly after a stay in port or another situation when they have been shut down. The jacket water circulation temperature to be raised over a period of time to as near to the operating temperature as possible. The time taken to warm the engine depends on the jacket water temperature prior to the start of circulation. Circulation should not start less than 12 hours before the estimated time of departure. Other circulating systems are to be put on line during this time too, such as; Lubricating oil systems. Fuel circulating systems.

  5. Standby to Departure On vessels where the engine is directly coupled to the propeller, the bridge has to be contacted and permission to turn the engine requested.After that, all the indicator cocks are to be opened. The engine is then to be turned a minimum of one revolution with the turning gear . during this time the indicator cocks are to be sighted for any evidence of oil or water discharge. If this test is satisfactory, then the indicator cocks are to be shut and the turning gear disengaged. It is very important that the disengagement of the turning gear is checked.

  6. Next, permission to turn the engine on air must be received from the bridge. All indicator cocks are to be opened. The engine is to be "kicked" ahead and astern on starting air. The indicator cocks are then to be closed.Following the satisfactory turning of the engine on air, the bridge is to be contacted and permission to turn the engine on fuel requested. After permission is received the engine be turned on fuel. The engine is to be turned dead slow ahead and astern on fuel.

  7. Preparations for standby1. The engine must be warmed by circulating hot water through the jackets. 2. The supply tanks, filters, valves and drains are all to be checked.3. The lubricating oil pumps and circulating water pumps are started and all the sight glasses observed.4. All control equipment and alarms are checked5. The indicator cocks are opened, the turning gear engaged and the engine turned through 2/3 revolutions so that if there is water in the cylinders it will be forced out.6. The fuel oil system is checked and circulated with hot oil.7. The turning gear is removed and the engine is turned over on air before closing the indicator cocks.8. The engine is now prepared for standby.

  8. The End