EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment

EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment. HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM. DESIGNERS FABRICATION Stephanie Worthington -Lead Larry Munk Danovic Spell SUPPORT GROUPS

helen
Download Presentation

EXPERIMENTAL BEAM TRANSPORT: g2P / geP Experiment

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EXPERIMENTAL BEAM TRANSPORT:g2P / geP Experiment

  2. HALL A g2P/ geP EXPERIMENTAL BEAM TRANSPORT TEAM DESIGNERSFABRICATION • Stephanie Worthington -Lead Larry Munk • Danovic Spell SUPPORT GROUPS • Bruce Reinhart HALL A coordinator’s Team ENGINEERS Accelerator: Installation • L. A. Dillon-Townes Alignment • Marie Ivanco Vacuum • Shirley Yang Electrical Groups

  3. CURRENT PREX EXPERIMENT EP Superharp Girder g2P/geP EXPERIMENT 87.693 cm Target Pivot Slow Raster Calorimeter FZ!1 & FZ2 REGION 5 REGION 3 REGION 2 REGION 1 REGION 4

  4. Target Strip Line BPMs Viewer FZ1 FZ2

  5. 1.1 GeV Tune Mode & High Current Running

  6. THE PROCESS • Engineering & Design Specification Development • Model the Optics Data in 3D space • Install Physical Hardware in this model • Develop an Experimental Definition Drawing • Develop and Publish a schedule for Engineering, Design, & Fabrication • Design Hardware • Initiate Fabrication • Monitor Installation

  7. CURRENT STATUS • OPTICS deck configuration in the process of being frozen • Finalizing the Experimental Definition Drawing • FZ Vacuum Chamber design complete • Calorimeter & Slow Raster Support Structure started • Vacuum Analysis started

  8. Engineering Topics • Bellows Definition • Magnet Elevation Motion • Magnet Alignment & Tilt control • Beam Tube Supports during Motion • Beam Viewer Camera Path during Motion