1 / 2

A Phase

Aseptic Substation High Voltage In feed Lines 12-15-06 Humidity 38% Temp 68 Degrees Wind 0-2 MPH Sea Level 385’ Clear conditions Tools Used CTRL UL 101 Receiver Power Beam 300 Parabolic reflector.

helena
Download Presentation

A Phase

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Aseptic Substation High Voltage In feed Lines 12-15-06 Humidity 38% Temp 68 Degrees Wind 0-2 MPH Sea Level 385’ Clear conditions Tools Used CTRL UL 101 Receiver Power Beam 300 Parabolic reflector A & B Phases are noisy. C phase is silent. Please click on the speaker icons to hear the ultrasonic emissions. Pressing escape once will turn off recording All main transformer high voltage in-feed insulator tops are as noisy as the A Phase in feed line seen here. Zero or near zero ultrasonic emissions were heard from low voltage components feeding the plant. B Phase A Phase

  2. Only the bottom line produces any sound. Norton substation appears to be quiet as well. The ultrasonic emission appears to be coming from the splice as seen in the photo. Please click on the speaker icon to hear the ultrasonic emission. Pressing escape once will turn off recording. Norton Alcola High Voltage In feed Lines 12-15-06 Humidity 42% Temp 72 Degrees Wind 1-3 MPH Sea Level 415’ Clear conditions Tools Used: CTRL UL101 Ultrasonic Receiver Power beam 300 Parabolic reflector

More Related