1 / 9

Project GabE ECE 135 – Spring 2005

Project GabE ECE 135 – Spring 2005. Omar Al-Jadda Adam Durity Rahmin Sarabi. Patrick Crosby. Progress Report. Gantt Chart Finalized Revised Transmitter Schematic Submitted for final review Drafted Receiver Schematic Submitted for initial review Drafted Transmitter Design

helenah
Download Presentation

Project GabE ECE 135 – Spring 2005

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project GabEECE 135 – Spring 2005 Omar Al-Jadda Adam Durity Rahmin Sarabi Patrick Crosby

  2. Progress Report • Gantt Chart Finalized • Revised Transmitter Schematic • Submitted for final review • Drafted Receiver Schematic • Submitted for initial review • Drafted Transmitter Design • Updated Bill of Materials • Received VCSEL and ROSA

  3. Gantt Chart

  4. Transmitter Schematic 2.0

  5. Receiver Schematic 1.0

  6. Transmitter Design

  7. Components Arrived • VCSEL: • Advanced Optical Components HFE419x-441 • ROSA: • Advanced Optical Components HFD3180-108

  8. Bill of Materials

  9. Upcoming Week • Finalize Receiver Schematic • Finalize Board Layouts • Submit for Review • Order Remaining Components • Begin Writing Midterm Report • Update Website

More Related