1 / 7

KX/ISA&G Requirements for EAS Jettison

KX/ISA&G Requirements for EAS Jettison. Sean Keefe x38215, Val Papanyan x35144 Donn Liddle x 39355, Ed Oshel x35335 Image Science & Analysis Group KX/ISA&G January 23, 2007. http://isag.jsc.nasa.gov. Topics for Discussion:.

helene
Download Presentation

KX/ISA&G Requirements for EAS Jettison

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. KX/ISA&G Requirements for EAS Jettison • Sean Keefe x38215, Val Papanyan x35144 • Donn Liddle x 39355, Ed Oshel x35335 • Image Science & Analysis Group KX/ISA&G • January 23, 2007 http://isag.jsc.nasa.gov

  2. Topics for Discussion: • Recent changes to EAS Jettison position & SSRMS joint angles & required camera viws for jettison analysis (S. Keefe) • EAS Jettison Lighting Requirements (S. Keefe & V. Papanyan) • Results of internal EAS Jettison sim (V. Papanyan & E. Oshel) KX/ISA&G • EAS Jettison: turn around time and expected accuracy of analysis (V. Papanyan) • Golf ball jettison results (V. Papanyan)

More Related