1 / 1

Alcatel Submarine Networks

Richard STEVENS. Relevant Experience / Work History. Alcatel Submarine Networks. Alcatel Submarine Networks. 36 Rue Sibuet 75012 PARIS +33608482836 Project Mana ger, Manager Physical Design Executive summary

helga
Download Presentation

Alcatel Submarine Networks

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Richard STEVENS Relevant Experience / Work History Alcatel Submarine Networks Alcatel Submarine Networks 36 Rue Sibuet 75012 PARIS +33608482836 Project Manager, Manager Physical Design Executive summary • Over 7 years of experience in Project Management for turnkey implementation of international Submarine Telecoms links. • Over 15 years of experience in leading and management of teams in CAD physical design on PCB and Full Custom Integrated Circuits. • Industry expertise • Electronics, Computers and Telecommunications Industries Education • G.C.E. ‘O’ level, vocational training certificate in Electronic Mounting, Cabling, Soldering. • Chartered Engineer in Electronics by Société Nationale des Ingénieurs Professionels de France in 1989. • (Member of the Union of Professional • Engineers (B.Sc.) in France) • POLYFORM : Management Technique– 1986 • SYNAXE : Management of projects – 1992 • Gary Oakley Associates : Project Management - 1998 Situation • A global Telecom Company to implement worlwide international submarine fibre optic networks (DWDM). • Action • Provided the technical interface to the Customers, coordinate and manage the supply, shipping, installation, training and commisssioning of Power Plant, Transmission & management equipment, Network Operating Center. • Developed a strategy to rescue & recover projects in stress. • Profit & Loss follow-up, Product Life Cycle follow-up. • Research, anticipation, analyse & resolution of the specifics problems linked to the Project or the Country. • Results achieved • Bonus payd by Customers for early delivery. • Adaptation, evolution, improvement of the standard B.O.Q. • Training & sponsorchip of the new employees, trainees, contractors. Author of the internal glossary (over 1400 terms) • Situation • Remodeling of all different activities splitted in many sites & departments. Creation of the Physical Design Group. • Action • Set up & motivate Group. Application of Alcatel Product & Design Life Cycle to multiple projects. Produce Quality charts. • Responsible for producing prototypes, validation & choice of the Sub-Contractors. • Responsible for technology transfer to English design centre for common mechanical design with Alcatel S9 practice. • Successfull data and documents transfer to English office after management decision of restructuring following buy-out. • Results achieved • Unrepeatered 2.5 Gbits Transmission Terminal prototype realised without error in 7 months. • Purchasers development adaptations on existing products in very short delays (6 to 8 weeks) Alcatel Telspace Philips Components, Philips Data Systems • Situation • Develop a Strategy to reinstate layout design, reduce costs & delays in the microwave & satellite earth stations department. • Actions • Rationalise methods & tasks. Multi projects organisation, GANTT planning. • Formulation of the internal design rules document, cleanup of the Data Base management, training & support. • Setup of the methodology interface for hyper frequencies with PCBs, for methods & document set harmonization. • Results achieved • Gain of 50 % on design cycle & quality improvement on iterations reduced from 7 to 2. • Reduction of working budget of 20 % in 1 year, of which 50% in sub-contracting. • Film suppression, gain of 0,2 M€ per year & reduction of 8 days on manufacturing. • Situation • European based global electronic manufacturer sought to implement VLSI design in Europe for new products. • Action • Creation of the CAE/CAD laboratories. Ergonomics conform ahead of time with French decree (1991). • Staff hiring, training in topology and software implementation. • Methodology, Quality (Crosby) & task organisation. • Formulation of the internal design rules document in French & in English. GANTT planning. • Micro-Controllers Floor Plan, Chip Finishing. • Results achieved • Introduction by Philips on the 16/32 bits microprocessors & microcontrollers market (SCC68070, PCB93C100/C110, • PCB97C100) for mini computer applications, CDI, video games, GSM phones.

More Related