1 / 14

Implementation of Active Flow Control using Microjets on an RC Aircraft

Implementation of Active Flow Control using Microjets on an RC Aircraft. Phil Kreth Hussein Nabulsi Dan Drake Matt Tubtim Faculty Advisor: Dr. Farrukh Alvi Sponsor: Dr. Gregg Abate (Eglin AFB). Presentation Outline. Background and Scope Needs Assessment Detailed Design

helki
Download Presentation

Implementation of Active Flow Control using Microjets on an RC Aircraft

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Implementation of Active Flow Control using Microjets on an RC Aircraft Phil Kreth Hussein Nabulsi Dan Drake Matt Tubtim Faculty Advisor: Dr. Farrukh Alvi Sponsor: Dr. Gregg Abate (Eglin AFB)

  2. Presentation Outline Background and Scope Needs Assessment Detailed Design Wind Tunnel Testing Spring Proposal Budget Analysis

  3. Background Flow separated ~16° AOA Reattached flow – 10 psig @ microjets Flow separation

  4. Needs Assessment Implement microjets on RC plane Run time should be 30 secs or more Remotely activate each wing Delay stall Budget = $1,50000

  5. Detailed Design

  6. Air Supply System

  7. Airframe Modification I Tank Location Shielding

  8. Airframe Modification II Struts

  9. Data Measurement Technique • Use a servo mounted camera • Watch flow reattachment using tufts

  10. Wind Tunnel Testing Image from tuft testing video. Click the picture for the full video (1.24 MB – 0:20)

  11. Spring Proposal Finish purchasing Build actuators and manifolds Machine hardware for plane modification Test actuators in wind tunnel Implement the system Flight testing

  12. Budget Analysis

  13. Conclusion Background and Scope Needs Assessment Detailed Design Wind Tunnel Testing Spring Proposal Budget Analysis

  14. Questions or Comments?

More Related