DrillScan-Software_North-Sea_Case-Study_HPCS017 PDF 4

Challenge<br>An operator in the North Sea faced a lower completion lock-up 800m above<br>total depth (TD), followed by a stuck pipe event in an ERD multi-lateral well.<br>In an initial effort to push the completion down to TD, all slack-off weight and<br>torque margin were used. Since no improvement was observed, the decision<br>was made to pull-out. However, the string remained stuck and despite the rig<br>efforts to free it, the lower completion had to be cut and left in hole.<br>Solution<br>H&Pu2019s DrillScanu00ae technology team performed an in-depth post-analysis,<br>reviewing all available data to identify what might hav

Download Presentation

DrillScan-Software_North-Sea_Case-Study_HPCS017 PDF 4

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


More Related