1 / 23

 ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

ALADIN co-operation A cluster of NWP projects Dijana Klaric , Dominique Giard, Andras Horanyi, Per Unden LACE ALADIN HIRLAM. ALADIN co-operation A cluster of NWP projects.  ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

heman
Download Presentation

 ALADIN consortium  ALADIN structure  ALADIN networking  ALADIN 2 Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ALADIN co-operationA cluster of NWP projectsDijana Klaric, Dominique Giard, Andras Horanyi, Per UndenLACE ALADIN HIRLAM 7th COSMO meeting Zurich

  2. ALADIN co-operationA cluster of NWP projects ALADIN consortium ALADIN structure ALADIN networking ALADIN 2 Project ALADIN-HIRLAM co-operation 7th COSMO meeting Zurich

  3. ALADIN Consortium F,RO,BG,CZ,HU,SK, PL,A,MC,SI,CR,B,PT,Mo,Tu (Al,Ma) I-----I-----I-----I-----I-----I-----I-----I-----I-----I-----I-----I----I 1990 1995 2002 7th COSMO meeting Zurich

  4. ALADIN Project Structure: • Assembly of ALADIN Partners • ALADIN MoU (II) • Coordinators for Scientific and Strategic Issues (CSSI) • National coordinators 7th COSMO meeting Zurich

  5. ALADIN tasks ARPEGE/ALADIN code development: • ALADIN mid-term scientific plans 3rd (2002-2004), transition plan for 2005 • local and centralized code development • common phasing for reference version (IFS/AR/AL) ALADIN Workshops (15th at Bratislava June 2005) ALADIN Newsletter (no 27 => no28) (www.cnrm.meteo.fr/aladin/newsletters/newsletters.html) 7th COSMO meeting Zurich

  6. ALADIN networking • 15 NWP groups • Meteo-France leadership (co-ordination,R&D, operations, ref. version, funds) • Regional projects with different goals: LACE - Central Europe (A,CR,CZ,HU,SI,SK) (operations ALADIN/LACE , R&D, funds) SELAM- SE Europe (Ro,Bg,Mo) Morocco -ALADIN/NORAF for ACMAD countries 7th COSMO meeting Zurich

  7. ALADIN R&D fundsNMC – MF – LACE – EU 7th COSMO meeting Zurich

  8. ALADIN 1991-2004 7th COSMO meeting Zurich

  9. ALADIN 2 ALADIN-2 ALADIN (2002-2008):convergence between international ALADIN and AROME projects ALADIN (1) Aire Limitée Adaptation dynamique Développement InterNational “good for today but not for tomorrow” ALADIN -2 AROME Limited Area Decentralised International Network 7th COSMO meeting Zurich

  10. ALADIN-2 tasks • To implement NWP systems at the meso- scale • To maintain the meso- operationalcapability at the state of the art level ALARO interface 7th COSMO meeting Zurich

  11. ALADIN 2 models (AAAA) • ARPEGE global model (20km mesh size) • ALADIN operational applications (8 km mesh size) • Decision about interfacing on the equation and code levels – (TCWSDPI, Nov 2004) • ALARO-interface (8-10km) prototype -Feb 2006 • AROME prototype (2.5 km mesh size) -April 2004 daily runs at: -Midi-Pyrénées, June 2005 - South-East domain, September 2005 1st AROME WS 21-25 November 2005, Romania 7th COSMO meeting Zurich

  12. ALADIN HIRLAMmesoscale co-operation 2003=> • HIRLAM for co-operation with AROME Project • ALADIN interest on HIRLAM DA achievements • Common interest in EPS on different scales “Future developments requires more resources that could be achieved by collaboration” 2004=>  Contacts at management levels - ALADIN coordinator at HAC - LACE Steering Committee open for HIRLAM  Co-operation on Council levels 7th COSMO meeting Zurich

  13. ALADIN HIRLAMconsortium 7th COSMO meeting Zurich

  14. ALADIN HIRLAMscientific and code cooperation • AAA training for HIRLAM MG on March 2004 • 14th ALADIN WS, June 2004 Innsbruck • Decision about interfacing on the equation and code levels – (TCWSDPI, Nov 2004, Prague) • ALADIN-HIRLAM reference code a ECMWF (2005) • HMG-CSSI coordination meeting, June 2005Bratislava • code collaboration and maintenance, phasing • Scientific strategy and working plans: dynamics and coupling, physics, surface, DA, predictability, verification • ALADIN-HIRLAM Sc. plan expected (October 2005) 7th COSMO meeting Zurich

  15. HIRLAM physics as switch in AAA • Meso-scale contribution on AROME physics • DA code merge (ODB) • Jo and Jb common work • Observations: radar reflectivities, MSG • Surface ISBA scheme • Externalize surface • Treatment of LBC  SHARED CODE  COMMON CODE 7th COSMO meeting Zurich

  16. ALADIN & HIRLAMworkshops HIRLAM-ALADIN mini-workshop on convection and cloud processes 24-26 January, 2005Tartu, Estonia ALADIN-HIRLAM workshop on code maintenance and data assimilation 14-18 November, 2005Budapest, Hungary 7th COSMO meeting Zurich

  17. ALADIN co-operationsfuture • ALADIN (internal) solidarity • Next ALADIN MoU (III) and HIRLAM 7 MoU s define the scope of the interest define the membership 5 years agreements • ALADIN-HIRLAM co-operation agreement Advanced EU co-operations and coordination  SRNWP co-ordinations (WS, MG meetings)  EU visibility and fresh funds (STORMNET) 7th COSMO meeting Zurich

  18. Acronyms • ALADIN- Air Limitée Adaptation Dynamique dévéloppement International • LACE -Limited Area modelling in Central Europe • ACMAD- African Center of Meteorological Applications of Development • AROME- Application of Research to Operations at MesoscalE • ALADIN2 Arome Limited Area Decentralised International Network  7th COSMO meeting Zurich

  19. 7th COSMO meeting Zurich

  20. 7th COSMO meeting Zurich

  21. AAA roadmaps 2008  • ARPEGE (TLS): • 15 km resolution over Europe, 4/day, 60-96h • ALARO : • 7-10 km, domain as ALADIN(2004), 4/day, 48-60h • AROME forecast: V1:3 km, reduced domain, 4/day 24h 10 times ALAD1 CPU V2 : 3 km, full domain, 4/day 48h 100 times ALAD1CPU • AROME nowcasting: • 3 km, reduced domain, 24/day, 3h 7 times ALAD1CPU • AROME substitute dynamical adaptation: • 3 km, reduced domain, 1/2h integration around lead times 3h, 6h, 9h, 12h, 15h, 18h, 21h, 24h, 30h, 36h, 42h, 48h (equivalent to a 6h forecast) 1/2 ALAD1CPU 7th COSMO meeting Zurich

  22. ALADIN HIRLAM Consortium 7th COSMO meeting Zurich

  23. 7th COSMO meeting Zurich

More Related