1 / 29

Single-Cavity Module Installation at MuCool Test Area

Single-Cavity Module Installation at MuCool Test Area. Yağmur Torun MICE Collaboration Meeting February 15, 2013. MTA 201-MHz Program Overview (Surface treatment, NF channel, MICE). 201-MHz MICE prototype cavity with SRF-like surface treatment (EP, HP rinse)

herman
Download Presentation

Single-Cavity Module Installation at MuCool Test Area

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Single-Cavity Module Installationat MuCool Test Area Yağmur Torun MICE Collaboration Meeting February 15, 2013

  2. MTA 201-MHz Program Overview(Surface treatment, NF channel, MICE) Y. Torun | MICE cm35 • 201-MHz MICE prototype cavity with SRF-like surface treatment (EP, HP rinse) • Conditioned to design gradient quickly • Demonstrated operation with curved Be windows • Somewhat reduced performance in fringe field of solenoid • No surface damage seen on cavity interior • Some evidence for sparking in the coupler • New design has been implemented • Radiation output measured (MICE detector backgrounds) • Future • Install/operate single-cavity vessel • Large diameter magnet (“coupling coil”) needed for field configuration closer to MICE/cooling channel

  3. 201-MHz Single-Cavity Module Y. Torun | MICE cm35 • MICE cavity in vacuum vessel for MTA test • Components • 1st MICE cavity EP’ed and now at Fermilab • Be windows ready • Tuner forks built • Ready for fabrication of new couplers

  4. 201-MHz Single-Cavity Module Y. Torun | MICE cm35 • Assembly/integration • Cavity and vessel at Lab-6 • Clean room prepared • Plan in place for handling and transport (R. Schultz, J. Volk) • Assembly fixture designed (A. DeMello) • Tuner control bench tested (P. Hanlet) • Expect operation Summer 2013 • beam test also under consideration • Ultimately will be tested with the first Coupling Coil Magnet • Requires 6-month MTA shutdown

  5. Current configuration • Original prototype cavity still in the hall • was lifted onto platform during long shutdown with shield wall out • using temporary forklift • No vacuum vessel, air outside • end-plates for support • Couplers already removed • one cut up for inspection • To be lifted off platform • with new gantry crane • span limited by entry maze • and rolled out through labyrinth on casters • Rails will be reused for new module • Be windows will be transferred to new cavity Y. Torun | MICE cm35

  6. Next -- Single-Cavity Vessel Y. Torun | MICE cm35

  7. Final layout -- RFCClite Y. Torun | MICE cm35

  8. Cavity in Lab-6 Y. Torun | MICE cm35

  9. Vacuum Vessel in Lab-6 Y. Torun | MICE cm35

  10. Module Transport Y. Torun | MICE cm35 • Will bring into MTA hall through labyrinth • Vessel with heavily ribbed doors too wide for labyrinth • Will remove and roll in doors separately • Put on thin cover plate to keep module interior clean • Module on stand too tall for clean room and labyrinth • New “transport” stand is 10” shorter • Tight fit – checked with laser scan data

  11. MTA Hall Layout Y. Torun | MICE cm35

  12. Laser scan data Y. Torun | MICE cm35

  13. Through the Maze Y. Torun | MICE cm35

  14. On Operational Stand

  15. On Transport Stand, thin doors

  16. Cover Plate Transport Y. Torun | MICE cm35

  17. Lab 6 Clean Room Y. Torun | MICE cm35 • Once doors removed & transport stand installed • Cavity installation – Vertical • In Lab 6 clean room – Class 100 • Insertion picture shown in clean room is old design • New design (A. DeMello) hot off the press • All mechanical assembly and RF testing in clean room

  18. Cavity handling Y. Torun | MICE cm35 Detailed procedure available from LBNL

  19. Tuner installation Initial concept – horizontal layout Y. Torun | MICE cm35

  20. Cavity installation • Vertical layout selected • Smaller footprint better suited to available clean room space • Similar to MICE RFCC • Simplified (one-sided) Y. Torun | MICE cm35

  21. Insertion Fixture in Clean Room Y. Torun | MICE cm35

  22. Assembly in MTA Hall Y. Torun | MICE cm35 • Remove transport stand, install operational stand • In MTA Clean Room • Install doors • RF Couplers • Other vacuum hardware

  23. Put on doors in MTA clean room Y. Torun | MICE cm35

  24. Rough schedule Y. Torun | MICE cm35

  25. Rough schedule Y. Torun | MICE cm35

  26. Rough schedule Y. Torun | MICE cm35

  27. Other issues • Couplers • preferable to test/condition before installation on cavity • couplers for prototype were conditioned at SNS on custom stand • looking into locating leftover parts to it back together (R. Rimmer) • or designing a new stand • Diagnostics • will build top plate with RF and vacuum pickups • acoustic sensors under test may be useful (P. Lane, P. Snopok) • RF controls • plan in place to upgrade Linac 201-MHz station (R. Pasquinelli) Y. Torun | MICE cm35

  28. Outlook • On track for results from operation of single-cavity module at MTA by cm37 • tight schedule and lots of work to do • resource availability critical • Installation will provide valuable experience for MICE RFCC module assembly • There may be an opportunity to test MICE RF phase measurement concept Y. Torun | MICE cm35

  29. Credits • Most mechanical engineering material from Ryan Schultz (FNAL) & Allan DeMello (LBNL) Y. Torun | MICE cm35