1 / 1

1998

Volume in number of orders processed. Avg cycle. 1998. 1999. 2000. 1998 cum. 1999 cum. 2000 cum. QMI. Cycle Reduction. Quality. Lot. ). (MMT’s. Number of Reports of Discrepancy (. RoD’s. ). Implementation. since implementation (5/3/99). -- 49. 1998 Benchmark.

Download Presentation

1998

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Volume in number of orders processed Avg cycle 1998 1999 2000 1998 cum 1999 cum 2000 cum QMI Cycle Reduction Quality Lot ) (MMT’s Number of Reports of Discrepancy ( RoD’s ) Implementation since implementation (5/3/99) -- 49 1998 Benchmark Wrong Quantity in a unit pack -- 8 Hours Discrepant Label -- 15 Wrong Material Shipped -- 7 Missing Parts -- 19 Warranty Returns -- 0 0 1998 Zero Container Failures Oct-99 Apr-99 Apr-00 Jun-99 Jun-00 Dec-99 Feb-99 Feb-00 Aug-99 Aug-00 Packaging Innovations Packaging Material Costs • Seven reports submitted • Blades in bags* Dollars (000) • No metal caps • Source packaging* Note: 8% increase in fiberboard 1st qtr 2000 • Fiberboard container edge crush test criteria • Foam in Place reduction* • Fiberboard Inserts* • Preservation Reduction* • Increased Automation • Rationalized fiberboard across GEAE sites* • Developing a Foam in Place Replacement-- Plastics Reduction • Rationalized to one type of tape -- No longer use glass tape or wet tape.* * Innovations directly attributable to Packaging Pilot

More Related