An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Load monitoring: 'It's only supposed to weigh a tonne!'

  2. Who We Are: More than 3 decades of experience in load monitoring and rigging, including accident investigation. Involvement in international load monitoring & rigging projects (including projects with NASA and Boeing). Design and manufacture of load monitoring and overload prevention systems.

  3. Look at this picture. Do the lines seem parallel? Well, check with a ruler- because they are!

  4. Which of the yellow lines is longer? They're both the same length!

  5. Does this load seem to be equally distributed? It’s not,although the truss is completely horizontal!

  6. What about this truss? Hard to believe, but the load is distributed completely equally!

  7. There is absolutely no connection between a truss being horizontal and equal load distribution!

  8. The reason behind this visual deception is the phenomenon in physics known as: Statically Indeterminate Structures: Each time there are more than two supports on a truss or more than three supports on a structure, the state of Statically Indeterminate Structure occurs, which results in an unpredictable load distribution. Consequently, some of the motors may become dangerously overloaded -- while other motors may bear only a small part of the load.

  9. This phenomenon is very tricky: • It misleads us into concluding that a horizontal truss • means that the load is equally distributed. • It might happen even if we know the weight of • each item and the total weight of the structure. • It has absolutely nothing to do with experience.

  10. Day to day reality is complicated due to this phenomenon: Production loads are becoming heavier and more dynamic. Multiple motor lifts are commonplace. Regardless of how experienced we are, and even if we know the load, load distribution is unpredictable. Tons of equipment are hung above performers and the audience.

  11. Tons of equipment hung above a large group of performers …

  12. Tons of equipment hung above a very crowded audience …

  13. How many unnecessary accidents happened, causing many millions of $ in damages and more importantly injuries and casualties?

  14. The influence of statically indeterminate structures on everyday riggingactivities: How many times has a situation been potentially close to failure and nobody knew? How many times has a little bit of good luck averted an accident?

  15. There is no practical way to know real load distribution unless loads are monitored. We must monitor loads and make sure they are distributed as intended.

  16. Principles of load monitoring: Loads should be monitored continuously because load distribution easily changes (for example, every time the rigger touches the controller). from installation to de-rig, not only at the first show. Immediate warning of the shifting load when overload starts to develop the system notifies the rigger with the exact location of the overload, enabling prompt preventive action.

  17. The benefits of load monitoring: Continuous protection against overload, preventing injury and costly accidents. Saves resources customarilyused to increase the safety factor when loads are unmonitored. Enables the use of venues previously ruled out because of doubts over load bearing capacity.

  18. To conclude, there are two options: The first is to do nothing, ignoring the danger and hoping for the best… Or: We can face up to the challenge and to our responsibility. How? By monitoring all loads rigged above people, ensuring their safety.

  19. There is a growing number of productions & venues that continuously monitor their loads. Here are some examples:

  20. Sydney Opera

  21. Esplanande Opera on the bay - Singapore

  22. Munich Olympia Park

  23. Boston Symphony Orchestra

  24. Casa da Musica - Porto

  25. Orange County Convention Center - Orlando

  26. AC/DC Black Ice World Tour AC/DC Black

  27. Human Castle Barcelona

  28. and thanks to the German company, Dart , the European shows of Metallica …

  29. Elton John …

  30. Cirque du Soleil …

  31. Lionel Richie, and many others.

  32. Thank You! Noga Eilon – Bahar noga.eb@eilon-engineering.com www.eilon-engineering.com