Beam Operation Experience at Quantum Beam Project in STF. Kirk. The answer is…. No change during “beam” operation in KEK-STF even after many earthquakes !!. MHI-12 and -13 were very stable in Quantum beam experiment. But…. We have a few examples for change in Cryomodule test.
E N D
Beam Operation Experience at Quantum Beam Project in STF Kirk TTC Meeting 2014@DESY
The answer is… No change during “beam” operation in KEK-STFeven after many earthquakes!! MHI-12 and -13 were very stable in Quantum beam experiment TTC Meeting 2014@DESY
But…. We have a few examples for change in Cryomodule test TTC Meeting 2014@DESY
History of Cavity Performance in KEK-STF • Vertical Test in CW mode • Cryomodule Test in Pulsed mode
Status of RF Conditioning for MHI-12 1500μsec 600μsec STF Cavity Group Meeting (2013/5/13)
Status of RF Conditioning for MHI-12 1500μsec STF Cavity Group Meeting (2013/5/13)
Status of RF Conditioning for MHI-12 1500μsec 600μsec STF Cavity Group Meeting (2013/5/13)
Status of RF Conditioning for MHI-12 1500μsec STF Cavity Group Meeting (2013/5/13)
Comparison of Radiation Level History MHI-12 MHI-13 The radiation level was never changed during the CM test.
Cavity performance degraded by “Earthquake” during beam operation? TTC Meeting 2014@DESY
Earthquake events at KEK-STF TTC Meeting 2014@DESY
Log Trend in 12/Oct/2012 MHI-12 MHI-13 TTC Meeting 2014@DESY
Log Trend in 24/Oct/2012 MHI-12 MHI-13 TTC Meeting 2014@DESY
Log Trend in 31/Oct/2012 MHI-12 MHI-13 TTC Meeting 2014@DESY
Log Trend in 7/Dec/2012 MHI-12 MHI-13 TTC Meeting 2014@DESY
After these earthquakes, the cavity performance was never changed!! TTC Meeting 2014@DESY
Cavity Performance for STF-2 TTC Meeting 2014@DESY
In future… The high power test in STF-2 will start from 2015. TTC Meeting 2014@DESY