90 likes | 226 Views
FASTRO. NEW PROCEDURE FOR THE CONSTRUCTION OF MASONRY BUILDINGS. NEW CONSTRUCTION SYSTEM. SIMPLE PROCEDURE - only two steps : 1 - Easy stacking of special blocks ( lightweight concrete ) - from foundation to roof
E N D
FASTRO NEW PROCEDURE FORTHE CONSTRUCTION OF MASONRY BUILDINGS
NEW CONSTRUCTION SYSTEM SIMPLE PROCEDURE - only two steps : 1 - Easy stacking of special blocks (lightweight concrete) - from foundation to roof 2 - Inflow (reinforced) standard concrete
NEW CONSTRUCTION SYSTEM • Eliminating problems of the ”THERMAL BRIDGES” • foundation • stairs • balcony • horizontal beams • plates (ceiling, floor) • roof surfaces
NEW CONSTRUCTION SYSTEM formation of plate
NEW CONSTRUCTION SYSTEM formation of wall
NEW CONSTRUCTION SYSTEM R O O F
NEW CONSTRUCTION SYSTEM wall coolingandheating
NEW CONSTRUCTION SYSTEM • INVESTMENTS AND THEIR JUSTIFICATION • total amount of investment: 1.700.000 € • payback time; 1 year • investment structure: a) credit: 1.700.000 € or • b) joint venture • gross income: 18.000.000 €/year • profit:10.800.000 €/year
NEW CONSTRUCTION SYSTEM F A S T R O bul. A. Čarnojevića 81 Belgrade, Serbia Tel. +381 11 311 42 95 Mob. +381 61 555 0 444 office@fastro.org mimarr@open.telekom.rs www.fastro.org