140 likes | 228 Views
The Tevatron Collider Upgrade to L=2E32 (aka Run II). 4. Steve Holmes Symposium in Commemoration of the 25 th Anniversary of First pbar -p Collisions at Fermilab December 17, 2010. Luminosity Strategy. Number of protons per bunch. Number of antiprotons (total). Beam emittance.
E N D
The Tevatron Collider Upgrade to L=2E32 (aka Run II) 4 Steve Holmes Symposium in Commemoration of the 25th Anniversary of First pbar-p Collisions at Fermilab December 17, 2010
Luminosity Strategy Number of protons per bunch Number of antiprotons (total) Beam emittance Tevatron Symposium, S. Holmes
TM-1491 Tevatron Symposium, S. Holmes
Main Injector Schedule 44 Tevatron Symposium, S. Holmes
Main Injector Construction Tevatron Symposium, S. Holmes
Recycler Tevatron Symposium, S. Holmes
MI and Recycler Complete Tevatron Symposium, S. Holmes
Run II Goals Tevatron Symposium, S. Holmes
Run II Luminosity First DOE Review Tevatron Symposium, S. Holmes
Electron Cooling Tevatron Symposium, S. Holmes
Some (nice) words about the DOE “Run II is not a construction project. Run II is a complex campaign of operations, maintenance, upgrades, R& D and studies.” D. Lehman to HEPAP, July 2003 Tevatron Symposium, S. Holmes
History of Run II Tevatron Symposium, S. Holmes