The Benefits of BIM for Formwork

Construction firms and Formwork production companies can leverage a 20% reduction in production time with high output quality. Creating a 3D model with precise GA and fabrication drawings with an accurate part count can save on cost and time. The use of tools like BIM360 drives quick access and modifications. Integration of Dynamo automation accelerates 3D modeling for Formwork. Check out the PPT to understand the benefits of Formwork for quick production.

Download Presentation

The Benefits of BIM for Formwork

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Benefits of BIM for Formwork

  2. Source: The Formwork market is projected to hit $6.37 billion by 2027 at a CAGR of 2.3%

  3. Who benefits from BIM-based formwork? Formwork Suppliers Construction Companies Project Owners Structural Engineers Contractors

  4. Why CAD-based tools often pose challenges? Lack of 3D visualization Absence of process transparency and clarity Higher onsite rework, material waste, and time overages Clashes between formwork components with 2D drawings Design ambiguities, greater RFIs during construction, and task delays Absence or inadequate collaboration Absence of real-time data in CAD blocks Improper use of formwork and project delays Inaccurate or erroneous formwork proposals Manual intervention and absence of automation

  5. Advantages of BIM-based Formwork Modeling 5

  6. Provide greater clarity and transparency 1 • The Need • A high-quality concrete casting • BIM-based 3D visualization ensures • Higher clarity and transparency through the entire formwork process • Interdisciplinary coordination with bi-directional information exchange • Accurate formwork modules-layouts before actual construction starts

  7. Resolve clashes in the preconstruction phase 2 • The Need • Reduce collisions between various formwork members • BIM-based interdisciplinary clash detection and resolution ensures • Preemptive interference-detection and resolution between various formwork members through clash detection • Reduced rework and material waste to avoid project delays and save building costs • Proper sequential planning of formwork with respect to each concrete casting

  8. Better collaboration with the project team 3 • The Need • Understand the design with greater clarity and relevance • BIM enables higher collaboration with multiple project teams for • Quick and accurate formwork planning and layout • Effective and efficient handling of change requests or RFIs • Faster identification and task assignment with greater clarity • Enhanced visualization and simulation for improved onsite operations

  9. Produce high-quality concrete cast elements 4 • The Need • Garner greater accuracy and quality of concrete elements • Use of 3D BIM in formwork design ensures • Quick generation of formwork parts through ERP integration. • Enhanced concrete pour cycles with BOQs and BOMs and evaluate multiple use of formwork and its prototypes. • Efficient planning and alignment with real-time data and comprehensive construction sequencing.

  10. Savings of cost & time with BIM-based formwork modeling 5 • The Need • Savings of project cost and timely completion with short TAT • BIM adoption for formwork in comparison to conventional methods results in • Coordinated formwork with concrete casting leads to seamless construction • Accurate material BOQs and BOMs lead to reduced material wastage and savings of project cost • Proper planning with BIM-based tools leads to reduction of project hiccups and ensures timely completion with short TAT

  11. Formwork construction for commercial office saves 20% time Formwork production companies can save 20% in production schedules, garner 100% output quality, and achieve accurate and seamless project documentation. Input Output Read detailed story at: / https://www.hitechcaddservices.com/case-studies/formwork-construction-on-bim-360-for-commercial-office-netherland/

  12. Optimize your formwork planning and layout with accurate and high-quality formwork designs. Get in touch with our BIM team to get formwork modeling solutions www.hitechcaddservices.com info@hitechcaddservices.com