1 / 8

Why do MEP contractors require BIM coordination services?

MEP systems constitute a major part of buildings and structures in terms of usage, cost, and time. BIM coordination services assist MEP contractors with accurate spatial coordination, exhaustive clash detection, precise documentation, quick project delivery, etc. Construction delays can be reduced by 40% to attain greater project performance and efficiency with clash-free MEP BIM models.<br><br>Check out this PPT to learn the benefits of BIM coordination services and the need for MEP contractors to adopt them.

Download Presentation

Why do MEP contractors require BIM coordination services?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Why do contractors require Your Partner in Process Excellence MEP coordination services?

  2. Challenges faced by MEP contractors • Inaccurate MEP designs leading to rework • Errors during onsite installation due to unidentified clashes • Low level of detailing due to uncoordinated 2D drawings & sketches • Meeting tight deadlines and controlling building costs Undetected clashes account for 5% of total construction spend (Source: Autodesk)

  3. Help meet project deadlines Early conflict resolution in MEP designs Provide hassle-free onsite installation Stay within planned budget with proper scheduling & planning by reducing unnecessary rework with spatially coordinated models with high level of detailing How MEP coordination services benefit MEP contractors

  4. 1 Clash identification & resolution at preconstruction stage Problem The MEP BIM Solution • Onsite interdisciplinary MEP clashes leading to : • Rework due to undetected clashes • Lack of visualization • Silo workflows • Errors during onsite installation • Early clash identification and resolution • Better visualization of MEP systems • Dynamic collaboration between various MEP trades • Interdisciplinary coordinated workflows • Covers 100% installation accuracy of MEP systems

  5. 2 Address MEP design conflicts at design stage Problem The MEP BIM Solution • Constructability issues lead to: • lack of spatial coordination • Absence of constructability analysis • Performance issues of MEP systems • Data-rich and coordinated MEP models • Real-time visualization of MEP systems • Better routing of MEP systems

  6. 3 Better scheduling with improved workflows Problem The MEP BIM Solution • Conflicts in workflow and equipment scheduling due to • Timeline conflicts and inaccurate material scheduling • workflow issues cascaded to next design phase • Ad-hoc site downtimes • Precise material and equipment scheduling • Accurate 4D scheduling and construction sequencing • Real-time walkthroughs of MEP systems

  7. Learn how BIM MEP Clash Detection for International Airport $7M saved by a General Contracting company for an airport project in Oman, with MEP clash detection and coordination services. Want to know how?

  8. Get a higher ROI for your construction project with effective MEP coordination services. Your Partner in Process Excellence www.hitechcaddservices.com | info@hitechcaddservices.com Contact our MEP experts today!

More Related