1 / 16

Progress Report Regarding Redesign and Packaging of Adirondack Chair

Progress Report Regarding Redesign and Packaging of Adirondack Chair. Team: 58 Project #F07-58ADRNDKCH Client: Garrett Cook Center For Comprehensive Services Team Members: William Fogerson Craig Craddock Jason Hick John Mathews & Mike Mayo. Outline. Background on Client

hogan
Download Presentation

Progress Report Regarding Redesign and Packaging of Adirondack Chair

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Progress Report Regarding Redesign and Packaging of Adirondack Chair Team: 58 Project #F07-58ADRNDKCH Client: Garrett Cook Center For Comprehensive Services Team Members: William Fogerson Craig Craddock Jason Hick John Mathews & Mike Mayo

  2. Outline • Background on Client • Background on Project • Computer Simulation • Physical Testing • Packing • Timeline • AIL • RASI • Summary

  3. Computer Simulation • Modeling • Computer Aided Design • 3D part drawings were constructed • Parts were then assembled as required • Finite Elemental Analysis • Stress analysis was performed on the original design and the new designs proposed • Maximum principal stress was compared for each design

  4. Computer Aided Design • Autodesk Inventor

  5. Computer Simulation • Original Design 100 psi 100lbf Couple

  6. Computer Simulation Cont’d • 2x6 Design 100 psi 100lbf Couple

  7. Computer Simulation Cont’d • 1x6 Design with Bracing and Glue • 100 psi 100lbf Couple

  8. Physical Testing • Test Set-up

  9. Physical Testing Cont’d • Average Force and Range of Force

  10. Physical Testing Cont’d • Range as a Percentage of Average Force

  11. Packaging • Procured Boxes, bubble wrap, and tape • Provide Client with 2 options • Option A • Smaller box therefore cheaper shipping cost • Much more assembly required • Option B • Larger box therefore more expensive to ship • Less Assembly required

  12. Timeline

  13. AIL

  14. RASI

  15. Executive Summary • Team Members • Background on Client • Background on Problems • Major Problems • Major Changes • Additional Resources

  16. Questions ?

More Related