This summary provides an overview of recent maintenance and studies conducted by the Tevatron Coordinator, as well as any problems encountered and pending studies for future improvements.
E N D
Supertable Tevatron Coordinator
Store Summary Tevatron Coordinator
Store Summary Tevatron Coordinator
Maintenance and Studies • B0 beam separations • C27, B47, B37, B17, A17 and A13 rough pump replaced. • C4 wet engine flying wheel replacement. Tevatron Coordinator
Problems • 6177: VB11 and VB12 tripped off during the store. Orbit stabilization took care of the orbit error. • #6179 quench caused by bad C49V power supply. • TRF8 trip => DC beam in abort gap. • C4, C3 wet engine work. • E4 cold compressor power supply fault. • Leak in BQ0 lead flow. Tevatron Coordinator
Pending Studies • Chromaticity tracker (proton only). Tan • Differential orbits (proton only). Sasha • P1 line matching (proton only). Sasha, Annala • Replacing new BLMs in all houses. • Install new 460 cards with new firmware. • Fast abort parameters adjust for LB QPMS. • CDF beam separation (EOS) Tevatron Coordinator