Steward Statewide Traffic Engineering Warehouse for Archived Regional Data Status Report: September 2008
Daily Reports ETL Process STEWARD Database Daily Archive Data Facility Data Analysis Reports Proof of Concept Project
Proof of Concept: March 2008 • District 2 data • Occasional manual data transfer by FTP • Basic reporting capability • Basic quality assurance • Traffic count demo • Internet demo • UF Campus based
Daily Reports • Daily conversion Report • Time covered • Orphan and null detectors • Polling interval distribution • Conversion History Summary (1 record per day) • Diagnostic Reports • Effective vehicle length distribution • Max flow rate at each station
QA Reports • Mobility Management (TTI) Tests • Lane distribution • I/O continuity • Comparison with Statistics Office counts
Analysis Reports • Daily Volume Summary for Freeway Lanes and Ramps • Lane Distribution Summary by Station • Link Continuity Report • Performance Analysis Report by Station • Level of Service Report
Summary Reports(Future) Daily Performance Summary Monthly Performance Summary Annual Summary and Trend Analysis
Travel Time Reliability Reporting(Requires discussion with Systems Planning Office) • Travel time reliability delay, based on 10 mph below speed limit vs congestion delay, based on TT index > 1.5. • Percent on-time arrivals • Must be geared to District’s TT link structure
All reports are generated in CSV format to facilitate further analysis, compilation and plotting
Past and Current Clients • Work-Zone Crash Analysis sponsored by the Southeastern Transportation Center • Analysis of Breakdown at a Freeway Ramp sponsored by National Cooperative Highway Research Program • Identification of Recurring Congestion by RS&H • Travel Time Reliability Reporting as part of Strategic Intermodal System management • Mobility Monitoring Program by Cambridge Systematics • Freeway Capacity Project sponsored by National Cooperative Highway Research Program
Resources for Continued Operation and Expansion • UF CMS Project • FDOT Research Office Project • TERL Support Activities
UF CMS Project ... • Present a series of stakeholder workshops • Expand to include additional SunGuide detectors • Operate the system to provide data and reports to agencies and researchers • Analyze the data to explore congestion modeling relationships
FDOT Research Office Project • Integrate Functions with Other FDOT Data Management Programs • Transfer Operations to the TERL Center in Tallahassee • Automate and fine tune the transfer of daily archive data reporting processes. • Expand to Include Other Data Sources
Current Activities and Progress • STEWARD Operation • Automation of data transfer • Expansion to other SunGuide TMCs • Integration with traffic counts • Internet site development
Current Activities and Progress • STEWARD Operation • Automation of data transfer • Expansion to other SunGuide TMCs • Integration with traffic counts • Internet site development
3. Return to TMC by email 2. Scheduled Task Process the archive data files to perform ETL and diagnostic functions STEWARD Etc. D5 D4 Diagnostic Reports 1. Scheduled Task “Push” daily archive file to UF FTP D2 FTP sites set up for each District Automated Archive Transfer
Current Activities and Progress • STEWARD Operation • Automation of data transfer • Expansion to other SunGuide TMCs • Integration with traffic counts • Internet site development
Working Paper CDW2008-1: Development of STEWARD Configuration Data for SunGuide Archives • Stage 1: Enables processing of daily archive data and diagnostic report generation • Stage 2: Enables loading of daily archive data into the STEWARD database • Stage 3: Enables full report generation
Diagnostic reports indicating archive data problems and inconsistencies Stage 1: Develop basic facility configuration and verify the integrity of the archive data 1. Obtain sample archive files from the TMC 2. Extract basic facility configuration required to produce diagnostic reports 3. Process several days of archive data using the basic configuration 4. Modifications to facility configuration by SunGuide staff
Reports for district review and refinement Stage 2: Expand the facility data configuration to include all data required for development of the STEWARD database 1. Add the data fields that can be extracted from the archive data or the district facility inventory 3. Process more archive data 2. Add the data fields that require individual attention in cooperation with the district
Stage 3: Expand the facility data configuration to include all data required for report generation 1. Add the data fields that require individual attention in cooperation with the District 2. Test the report generation features Reports for district review and refinement
District 2 Status • I-95 at Stage 3 (Proof of Concept project) • Data availability TSS: 6/28/07 ~ 2/6/08 TVT: 2/25/07 ~ 2/5/08 Incident: 5/10/06 ~ 2/5/08 • 133 TSS stations with RTMS detectors and 37 TVT links • District is adding detectors on I-295 and I-10
District 4 Status • Stage 1 (TSS ), No TVT data yet • Data availability TSS: 5/18/08 ~ 7/21/08 TVT: None Incident: None • TSS stations: 100 detectors at I-95 and 30 at I-595 • Invalid time stamps on some records
District 5 Status • Stage 1(TSS and TVT) • Data availability TSS: 4/24/08, 5/2/08, 5/3/08 TVT: 4/24/08, 5/2/08, 5/3/08 Incident: None • TSS stations: 143 detectors at I-4, 124 at I-95, 14 at SR-528 and 70 unknown • TVT links: 310 at Turnpike, I-4, I-95, SR 408, SR 414, SR 417, SR 423, etc • Some invalid data (e.g., negative speeds and occupancies)
District 6 Status • Stage 1 (TSS and TVT) • TSS detector locations are not available • Data availability TSS: 5/26/08 ~ 7/21/08 TVT: 5/26/08 ~ 7/21/08 • TVT link locations: SR 826, I-75, SR 826, I-195 • Duplicate data records on some days • 2 min TVT sampling rate will not support 5 or 15 min aggregation
District 7 Status • Stage 1 (TSS), No TVT data • TSS stations: 104 detectors at I-275 and 46 at I-95 • TSS data availability: 6/3/08 ~ 6/5/08 • No apparent issues in TSS data
Modifications to Accommodate Additional TMCs • Station number: increase from 2 characters to 3 characters Impacts: SunETLUtility was revised All the transformations were rerun All the data were reloaded into the database All the materialized views were regenerated Steward web interfaces were updated Overall system operations were tested and verified step by step • Steward testbed was built to test the multiple districts. District 2 and 4 data were loaded and Steward operations were tested.
Other Modifications in Progress • Conversion program from TSS data to traffic count are included in the Steward • Max numbers of lanes and ramp per station must be extended from 6 and 3. District 6 has several stations with 7 lanes or 5 ramps.
Current Activities and Progress • STEWARD Operation • Automation of data transfer • Expansion to other SunGuide TMCs • Integration with traffic counts • Internet site development
Working Paper CDW2008-2:Conversion of SunGuide Archive Data to the FDOT Count Formats • Good potential for agreement • Mutual calibration and improvement of data quality • Supplement to District counts
Traffic Counts Traffic Counts Lane counts (CSV) STEWARD Database Statistics Office ITSCounts Utility District Planning Office SPS ITS Traffic Counts
Current Activities and Progress • STEWARD Operation • Automation of data transfer • Expansion to other SunGuide TMCs • Integration with traffic counts • Internet site development http://cdwserver.ce.ufl.edu/steward/index.html
Next Steps ... • Continuing the operation of STEWARD to capture the SunGuide archive data • Continuing our efforts to bring more SunGuide TMCs into STEWARD • Expanding the automated transfer of archived data to all districts • Coordinating with District Planning Offices to produce traffic count data • Improving the Internet interface to facilitate queries and report production
Future Steps ... • Reporting Procedures • QA Procedures • Transfer to TERL • Crash Record Integration • Congestion Modeling • Workshop Presentations