An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Philex disaster The foreseen long-term damage is irreversible,

  2. The Philex disaster is the biggest in Philippine mining history, dumping a staggering 21 million metric tons of toxic tailings on the watershed system along the Balog-Agno Rivers all the way to San Roque Dam, which supplies critical power and irrigation to Central Luzon. The foreseen long-term damage is irreversible, affecting millions of lives, and vast areas of the Central Luzon ecosystem for many generations to come.

  3. Philex claims its mining operations give livelihood to thousands of Filipinos and contribute to Philippine economic growth. In 48 years of operations, Philex earned $2.7 billion or Php 120 million. But the damage it has caused and will cause is estimated to be ten fold of its earnings. It has set an example that mining is not sustainable and yields benefit to a few rich and harm to many Filipinos.

  4. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt

  5. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt 2007 – 9.07 mmt

  6. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt 2009 – 127.23 mmt 2007 – 9.07 mmt

  7. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt 2009 – 14.77 mmt unused 2009 – 127.23 mmt 2007 – 9.07 mmt

  8. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt 2009 – 14.77 mmt unused 2009 – 127.23 mmt average 39.39 mmt / year 2007 – 9.07 mmt

  9. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt walls raised 5 m (continuously?) 2009 – 14.77 mmt unused 2009 – 127.23 mmt average 39.39 mmt / year 2007 – 9.07 mmt

  10. “According to Philex records, the dam embankment of tailing pond 3 is continuously being built-up by Philex Mines to maintain a freeboard of 5 meters at the mine dike.” Dr. Arturo Boquiren ‘Dossier on Philex Mines’ May 2009

  11. By how much was the wall raised finally? Did they just keep raising the walls slowly as the contents go up? Even a non-engineer knows the implication of raising the walls of a dam as contents accumulate. It means it will carry greater volume of tailings beyond the originally designed capacity.

  12. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt walls raised 5 m (continuously?) 2009 – 14.77 mmt unused 2009 – 127.23 mmt average 39.39 mmt / year 2007 – 9.07 mmt

  13. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt predicted volume on august 2012 collapse – 245.39 mmt walls raised 5 m (continuously?) 2009 – 127.23 mmt average 39.39 mmt / year 2007 – 9.07 mmt

  14. Over-capacity 103 mmt Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt predicted volume on august 2012 collapse – 245.39 mmt walls raised 5 m (continuously?) 2009 – 127.23 mmt average 39.39 mmt / year 2007 – 9.07 mmt

  15. Over-capacity 103 mmt Philex Tailings Dam No. 3 Life span 20 years (1992-2012) capacity – 142 mmt above ground outflow predicted volume on august 2012 collapse – 245.39 mmt walls raised 5 m (continuously?) penstock 2009 – 127.23 mmt average 39.39 mmt / year collapse of outflow pipe 2007 – 9.07 mmt underground outflow

  16. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) above ground outflow void after collapse underground outflow

  17. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) above ground outflow void after collapse two 40-meter cement plugs underground outflow

  18. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) above ground outflow primary dike void after collapse secondary dike underground outflow

  19. Philex Tailings Dam No. 3 Life span 20 years (1992-2012) Source - MGB above ground outflow primary dike area scoured by water – 15% void after collapse now full of water secondary dike underground outflow

  20. If EMB approved the raising of the wall, is it not just as culpable? Philex points an accusing finger on government for approving the raising of the wall. Was there collusion among engineers of Philex and EMB with or without the knowledge of their managements?