1 / 25

5 th Progress Meeting INASCO (22 nd /23 rd May 2012)

5 th Progress Meeting INASCO (22 nd /23 rd May 2012). Emile S. Greenhalgh, Project Co-Ordinator. T he Composites Centre, Imperial College, London. Agenda – 3 rd Progress Meeting Tuesday 22 nd May (am). 09:30 Coffee, Welcome and Introductions 09:45 Minutes of the Last Meeting

hollye
Download Presentation

5 th Progress Meeting INASCO (22 nd /23 rd May 2012)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 5th Progress MeetingINASCO (22nd/23rd May 2012) Emile S. Greenhalgh, Project Co-Ordinator The Composites Centre, Imperial College, London

  2. Agenda – 3rd Progress Meeting Tuesday 22nd May (am) 09:30 Coffee, Welcome and Introductions 09:45 Minutes of the Last Meeting 10:00 WP1: Management/Overview of Project and Deliverables (Imperial/SICOMP) 10:15 WP1: Status of project extension (Imperial/SICOMP) 10:30 WP2: Reinforcement Development (Nanocyl) - overall status and management 10:45 WP2: Partner Presentations (max 20 minutes each) WP2 - Nanocyl, SwereaSicomp, BAM, ETC 11:30 WP3: Multifunctional Resin Development (Imperial) - overall status and management 11:45 Partner Presentations (max 20 minutes each) WP3 - Imperial College London, SwereaSicomp, Inasco, Chalmers, Umeco, BAM, ETC 12:30 WP8: Project Demonstration and Exploitation (Inasco) 13:00 Lunch

  3. Agenda – 3rd Progress Meeting Tuesday 22nd May (pm) 14:00 WP6: Systems (SICOMP) 14:15 Partner Presentations (max 20 minutes each) WP6 - Swerea Sicomp, Imperial College London, Inasco, Volvo, ETC 15:15 WP7: Demonstrator Development (SICOMP) 15:30 Partner Presentations (max 20 minutes each) WP7 - Swerea Sicomp, Imperial College London, Inasco, Chalmers, Umeco, Nanocyl, BAM, Volvo, ETC 16:00 WP6/7 Discussion – Design of Wheel Well 17:00 End of day one 19:00 Common dinner in Athens

  4. Agenda – 3rd Progress Meeting Wednesday 23rd May (am) 09:15 Coffee and Welcome 09:30 WP4: Composite Manufacture (Umeco) - overall status and management 09:45 WP4: Discussion regarding weave issues and suggested mitigation (Imperial) 10:45 Partner Presentations (max 20 minutes each) WP4 – Umeco, Imperial College London, Inasco, Swerea SICOMP, Nanocyl 11:15 WP5: Composite Characterisation (BAM) 11:30 Partner Presentations (max 20 minutes each) WP5 – BAM, Imperial College London, Swerea Sicomp, INASCO, Chalmers, Umeco 12:30 AOB, Date of next meeting and close 13:00 Lunch 14:00 Optional tour of INASCO facilities

  5. Agenda – 3rd Progress Meeting Objectives of Meeting • Report on Progress in all Work Package, and compare with plan • Progress the design of the wheel well (WP6/7) • Resolve the issue of the influence of weave on electrical performance (WP4/5)

  6. Evening Plans Dinner is at 8pm and the location is Filistron restaurant. 23, Apostolou Pavlou str. Thission Athens 11851 info@filistron.com +30 103422897 http://www.filistron.com/ 6

  7. Actions from Last Meeting

  8. Actions from Last Meeting (Continued)

  9. Actions from Last Meeting (Continued)

  10. Actions from Last Meeting (Continued)

  11. Model Demonstrator • Radio controlled car built by SICOMP & Umeco • Two cell Device B laminates • No batteries in car, battery in controller charges roof laminate which lights LEDs • Raised cutting/grinding issues – laminates need to be made to size • Demonstrated at a exhibitions, etc • Umeco stand at JEC (Paris, 03/2012) • Swedish Foundation for Strategic Research’s (SSF) Materials Science Programme Conference - Stockholm (04/2012). • Video for ‘Fully-Charged’ show - http://www.youtube.com/watch?v=rMOxrDxq_do&list=PL971B96323746C745&index=8&feature=plcp • Imperial Festival (05/2012) 11

  12. Actions from Last Meeting (Continued)

  13. Actions from Last Meeting (Continued)

  14. Actions from Last Meeting (Continued)

  15. Actions from Last Meeting (Continued)

  16. Dates for Future Meetings(Assuming Extension) December 2012 Progress Meeting #6 – Imperial College London, UK June 2013 Final Meeting – Volvo Car Corporation, Sweden,

  17. Device Configurations Supercaps 3 ply laminates (CF/GF/CF); Batteries 7 ply laminates (CFi/GF/CFii/GF/CFii/GF/CFi)

  18. Laminates

  19. Laminates

  20. Mechanical Testing Regime

  21. Electrical Testing • Supercapacitors: • Charge-discharge experiments: Voltage - 0.1 V (most likely we will increase voltage); Charge time  10 s (can be varied); Discharge time 10 s (can be varied). • Cyclic voltammetry: sweep rates of 5 mV/s to 50 mV/s, window of −0.5 to 0.5 V. • Electrochemical impedance; frequency range from 106 Hz to 10-3 Hz, sinusoidal voltage amplitude  5 mV. • Effect of moisture/temperature; DiAMon monitoring • Batteries: • Capacity and energy cycling, (Charge/Discharge) • Self discharge • Internal resistance - pulsed charge/discharge • OCV characterisation, Life length • Capacitors: • effect of moisture and temperature DiAMon monitoring • dielectric strength ? • capacitance/ (specific energy) - 0.1-100Hz at 1V

  22. Gantt

  23. Deliverables Completed to date 23

  24. Deliverables due soon 24

  25. Deliverables due before next meeting 25

More Related