1 / 3

Interoperability between OSG and LCG/EGEE Current Status:

Interoperability between OSG and LCG/EGEE Current Status:. ATLAS and CMS have been running their simulation applications across the LCG-2 and OSG infrastructures for over a year (2 years?): - ATLAS uses Don Quixote to adapt between different catalogues and job submission systems.

holt
Download Presentation

Interoperability between OSG and LCG/EGEE Current Status:

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Interoperability between OSG and LCG/EGEECurrent Status: • ATLAS and CMS have been running their simulation applications across the LCG-2 and OSG infrastructures for over a year (2 years?): • - ATLAS uses Don Quixote to adapt between different catalogues and job submission systems. • - CMS runjob can submit jobs to LCG-2 and OSG/Grid3. • US CMS Tier-1 demonstrated interoperability between LCG-2 and Grid3 at the CE and SE interfaces at the end of last year. US CMS Tier1 visible from Grid3 & LCG-2. • Proposal for Interoperability work developed between US ATLAS, OSG Integration Test bed and LCG-2 at the end of last year (see next slide). • Storage Services are interoperating as part of the Service Challenges. • Agreement at RAL meeting on Glue Schema V1.2 and plan for agreement on V2. • LCG-2 Generic Information Providers to be included in VDT 1.3.X (6?), will be optionally enabled on any OSG site. • - GIPs and BDII tested by iGOC at the end of 2004. • - US CMS testing GIPs on Tier-2s for submission of job. through LCG-2 UI to OSG CE/SEs and from MOP submission to LCG-2 CE/Ses. A feasibility test. .

  2. Possibilities for further Interoperability work: • OSG working through the Interoperability Activity. Laurence Field attends the bi-weekly phone meetings. (also includes interoperability with TeraGrid). • Suggestions for work items from document: • Security - joint security service challenge in planning. • Job monitoring - Logging and Bookkeeping - ? Any next steps taken? • Operations monitoring - LCG looking an a feasibility study of MonaLisa? Any suggestions for upcoming LCG Operations Workshop? • Accounting - can we talk a bit more about this? • Information system – BDII • Job submission • Dealing with multiple VO’s; generic VO’s • Can we think of some specific demonstrations to work towards for SC2005?

  3. Accounting.. • Accounting will become increasingly important. • Current “LCG” acounting url is currently the EGEE accounting: • LCG -> Monitoring -> Accounting -> Country etc. • OSG Accounting Activity being formed • - PDDG storage accounting being developed in Common Project at SLAC/LBNL • Fermilab/US CMS Grid Accounting project is now staffed. • In Interoperation document Accounting has as a first item: “Identification, description of accounting metrics and formats.” • - Model could be that LCG collaboration would work with OSG and EGEE on this??

More Related