An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Moving Forward with the USEPR Greg Gibson Vice President Regulatory Affairs

  2. Discussion Topics • UniStar • Current Status of the EPR • USEPR Owners Group • EPR Fleet Experience Feedback • ITAAC (Inspections, Tests, Analyses Acceptance Criteria)

  3. UniStar: • Like-minded owners • Shared resources • Shared generic development costs • Standardized fleet • AREVA’s U.S. EPR technology Cost Optimization: • Generic DDE • Licensing (DCD, COLAs) • Equipment procurement • Construction best practices • Operating procedures • Simulator and training development • Communications programs

  4. UniStar Business Model Principles • Standardization • Use FL-3 design criteria for control room, MMI and TG/BOP design • Use EDF planning, construction, startup and operating experience and procedures • Maximize the use of real time OL-3 and FL-3 lessons learned • Create processes to maintain fleet standardization in all project phases • Risk Mitigation • Levelize the most controllable portions of overnight capital costs (paper and procurement) • Risk management improves as fleet size grows • Flexibility • Provide the tools and procedures needed by owners in licensing, EPC and operations of the Fleet • Operate U.S. EPRs as a standardized fleet, through the entire plant lifecycle

  5. UniStar Project Timelines COD Calvert Cliffs3 - MD Nine Mile Point - NY Callaway - MO Bell Bend - PA New Project COL Issued Construction begins 2011 2012 2013 2014 2015 2016 2017 2018 2019 2020 5

  6. Current Status of the EPR

  7. EPR in Finland: Olkiluoto 3

  8. MAY 2006 MAY 2007 MAY 2008

  9. EPRTM in China Artist rendering of Taishan site with four EPRs January 2009 – Taishan construction site

  10. New EPRs • Penly 3 Status • Electricite de France and GDF Suez welcomed the announcement of a second French EPR, to be built in partnership at the Penly nuclear power plant site on the Channel. • Potential additional EPR in France (3 total by 2020)

  11. EPR Owners Group Common Interests: CHINA Each EPR project belongs to a worldwide community TVO OL3 EPR What affects one of us will impact all of us Common Interests UK USEPR EPR Fleet 4 EDF FA3 EDF/GDF Suez Penly 3 We need an organization and a means to communicate

  12. EDF to UniStar FA3/OL3 Lessons Learned Transfer Process

  13. How ITAAC Fits Into Commissioning Tests * Inspection, Test, Analysis, Acceptance Criteria

  14. Current ITAAC Challenges • There are currently 1000+ ITAAC which will require detailed plans for execution, scheduling, documentation, and NRC notification = collaborative effort • NRC review and approval of ITAAC in the DCD is not yet complete and will likely result in comments. • Configuration Management of completed/inspected ITAAC is yet to be developed. • ITAAC delays during construction and/or testing could impact the fuel load schedule, and Commercial Operation Date.

  15. Objectives of an ITAAC Program: • The ITAAC process should take advantage of current processes/programs (i.e., QA Program, Pre-Op Test Program) • “Book of ITAAC” • Detailed description and definitions for each ITAAC • Execution Plan including methodology & closure criteria • Sequence and Schedule • Ensure the Schedule is shared with the NRC so independent verification and validation is ensured

  16. Objectives of an ITAAC Program: • ITAAC results should not result in unexpected NRC findings. • ITAAC inspections hopefully will not impact the construction schedule. • ITAAC information and Project Schedule should be provided to the NRC in a proactive manner to avoid impacts on schedule. • Owners should have a close working relationship with the NRC in order to establish and implement the ITAAC process. • Experience from the industry will be shared – NRUG concept