An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PDBS ESTIMATE SYSTEM TRAINING TRAINING

  2. ENGINEER’S ESTIMATELANE RENTAL

  3. EXAMPLESPECIAL PROVISION FOR “LANE RENTAL” LANE RENTAL TABLE

  4. EXAMPLECREATING “LANE RENTAL”DETAIL AND ITEMS ADD DETAIL“INNOVATIVE CONTRACTING”

  5. ADD “LANE RENTAL” TO DETAIL DESCRIPTION

  6. ADD “ITEM” TO DETAIL

  7. ADD ITEM DEFAULTS “ITEM #”, “DESCRIPTION”, “QTY” AND “UOM”

  8. INCREASEITEM #BY ONETO ADDADDITIONALITEMS. CREATE DESCRIPTIONS, QTY, UOM AND UNIT PRICE TO MATCH THE LANE RENTAL SPECIAL PROVISION

  9. EBS EXAMPLE BIDDERENTERSNUMBER OF HOURS.

  10. ENGINEER’S ESTIMATEBIDDINGCONTRACT TIME

  11. EXAMPLESPECIAL PROVISION FOR “BIDDING CONTRACT TIME”. MULTIPLE TIME SEGMENTS TABLE

  12. EXAMPLEENGINEER’S ESTIMATE SETUP ADD DETAIL“INNOVATIVE CONTRACTING”.ANDENTER DESCIPTION“BIDDING CONTRACT TIME”

  13. INCREASEADDED ITEM #BY ONETO ADDADDITIONALITEMS. CREATE DESCRIPTIONS, QTY, UOM AND UNIT PRICE TO MATCH BIDDING CONTRACT TIME SPECIAL PROVISION

  14. EBS EXAMPLEBIDDING CONTRACTORENTERS NUMBER OF CALENDAR DAYS

  15. EXAMPLEBIDDING METHOD A+B SPECIAL PROVISION

  16. EXAMPLE FOR OLDENGINEER’S ESTIMATE SETUP

  17. A + B WINDOWOPTION NOTAVAILABLE

  18. EXAMPLE A + B SETUP ADD DETAIL“INNOVATIVE CONTRACTING”

  19. ADD DESCRIPTION“A + B BIDDING”

  20. CREATE ITEM DESCRIPTION, QTY, UOM AND UNIT PRICE TO MATCH A+B SPECIAL PROVISION

  21. EBS EXAMPLEBIDDING CONTRACTORENTERS NUMBER OF CALENDAR DAYS NOTE“A” AND “B” ARE SUBTOTALED SEPARATELY

  22. LOOKUPITEM PRICE

  23. EXAMPLELOOKUP ITEM PRICE FOR SELECTED ITEM. RIGHT MOUSE CLICK“UNIT PRICE” SELECT“LOOKUP ITEM PRICE”

  24. EXAMPLE‘ITEM PRICE LOOKUP WINDOW’ SELECTLOOKUP CRITERIA SELECT“OK”

  25. SELECTED CRITERIARESULTS OPTIONS:RETURN TO ESTIMATE WITH “STATEWIDE” OR “REGION”AVERAGE PRICE SELECTED CRITERIA

  26. RETURNS UNIT PRICE FOR SELECTED OPTION.

  27. ENGINEER’S ESTIMATECOMPARISON REPORT

  28. SELECT PROJECTIN ESTIMATE WINDOW SELECT‘ESTIMATE’ SELECT‘REPORTS’SELECT‘ENGINEER’S ESTIMATEPRICE COMPARISON’

  29. CRITERIA OPTIONS:“DATE RANGE”“LOCATION”“BIDS”“FUNDING” SELECT“GENERATE”AFTER SELECTINGCRITERIA

  30. NOTE:ITEM UNIT PRICES NOT WITHIN 10% OF AVERAGE PRICE FOR THE SELECT CRITERIA ARE HIGHLIGHTED IN “RED”.