1 / 7

Industrial Areas Masterplan Saarland

Industrial Areas Masterplan Saarland Development of large industrial areas for new businesses and company expansions in Saarland. This project is co-financed by the European Union. iNDUSTRIAL aREAS mASTERPLAN sAarland FOUR NEW INDUSTRIAL AREAS. Development of four new industrial areas ( GI):

hosea
Download Presentation

Industrial Areas Masterplan Saarland

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industrial Areas Masterplan Saarland • Development of large industrial areas for new businesses and company expansions in Saarland This project is co-financed by the European Union MASTERPLAN AREAS SAARLAND

  2. iNDUSTRIAL aREAS mASTERPLAN sAarland FOUR NEW INDUSTRIAL AREAS • Development of four new industrial areas (GI): • Prime locations • Excellent transport links • Areas tailored to the investor´s needs, generous sections of land • Fully developed according to the Baugesetzbuch (BauGB) • Convenient for industry and service companies new industrial areas totalling 264 ha www.masterplan-saarland.de MASTERPLAN AREAS SAARLAND

  3. Industrial Areas Masterplan saarland GI Lisdorfer Berg, saarlouis • Facts and Figures • Total size (gross): 100 ha • Buildable area: 67 ha • Single areas available from: 1 ha • Transport Links • Federal road B296 neu immediately adjoining to the Industrial Area • Direct linkage to French motorway A4 with access to the motorway direction Strasbourg / Basle • Direct linkage to motorway A8 • Excellent accessibility to motorway A6 direction Mannheim / Frankfurt a.M. • Media / Connections • All important media connections, e.g. gas, waste water, water, electricity and broadband, are available. • Current Project Status • Development to be completed end of 2014 • Starting construction parallel to the development work can be agreed The currently largest industrial development area in Southern Germany MASTERPLAN AREAS SAARLAND

  4. Industrial areas Masterplan saarlandGI Am Zunderbaum, Homburg / Kirkel • Facts and Figures • Total size (gross) 50 ha • Buildable area: 41 ha • Single areas available from 0.2 ha • Transport Links • Motorways A6, A8 (Mannheim-Paris, Trier-Karlsruhe) as major traffic hubs can be reached easily without crossing town. • Media / Connections • All important media connections, e.g. gas, waste water, water, electricity and broadband, are available. • Current Project Status • The development of a surface of 41 ha shall be finished in the second quarter of 2015. • Starting construction parallel to the development work can be agreed. The peripheral location allows for shift work and storage MASTERPLAN AREAS SAARLAND

  5. industrial areas Masterplan saarlandGI AM Schaumberg, Tholey/Theley • Facts and Figures • Total size (gross): 23 ha • Buildable area: 15 ha • Single areas available from: 0.7 ha • Traffic Links • Motorway A1 in direct vicinity • Optimal accessibility of the West German region • Media / Connections • All important media lines for gas, waste water, water and electricity are available. • Current Project Status • The area is completely developed and ready for immediate construction. MASTERPLAN AREAS SAARLAND

  6. industrial areas Masterplan saarlandGI Holz, Losheim-Niederlosheim • Facts and Figures • Total size (gross): 30 ha • Buildable area: 26 ha • Single areas available from:0.5 ha • Transport LInks • Located directly at federal road B268 • Easily accessible via motorways A620 and A1 • Media / Connections • All important media lines for gas, waste water, water and electricity are available. • The media supply can be adjusted to the individual needs of the investor. • Current Project Status • The area is completely developed and ready for immediate construction. MASTERPLAN AREAS SAARLAND

  7. ContaCt • gwSaar Gesellschaft für Wirtschaftsförderung Saar mbH • ATRIUM Haus der Wirtschaftsförderung • Franz-Josef-Röder-Straße 17 • D-66119 Saarbrücken • Phone: +49-681-9965-400 • Fax: +49-681-9965-174 • E-Mail:info@invest-in-saarland.com • Internet: www.invest-in-saarland.com Your contact at gwSaar: • Mrs. Ute PetersenAuthorized Signatory+49-681-9965-285 • petersen@gwsaar.com • Mrs. Martina Salerno-Schwarz • Sales Management • +49-681-9965-257 • salerno-schwarz@gwsaar.com MASTERPLAN AREAS SAARLAND

More Related