An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 94th EN BN CONUS Construction Riverbend, Phase IIIA Laredo, TX 24 January 2010 – 10 March 2010

  2. Overview Mission: 94th EN BN deploys a horizontal construction platoon (+) to Laredo, TX O/A 29JAN10 IOT improve a 0.88 mile length of road with cut/fill operations, caliche, and proper drainage; and redeploys to Fort Leonard Wood, MO O/A 07MAR10 IOT support the Department of Homeland Security’s mission on the US-Mexico Border. Scope of Work: • 0.88 mile of 24’ wide, all-weather patrol road • 3 concrete low-water crossings • 250 feet of guard rail, 19 road signs, 40 linear feet of pipe gate, post and cable barricades • Over 1000 linear feet of drainage ditches METL trained: • Deploy personnel by air, quartering party operations. • Road construction: Clearing, grubbing, cut/fill, spreading material, shaping material, compaction. • Reporting procedures, construction progress tracking.

  3. AO Orientation

  4. Concept of the Operation Phase I - Planning JTF-N Contacted 94th EN BN, with proposed construction project Plans & SOW complete, Company tasked Platoon begins planning S3 & S4 Site Recon Platoon OIC & NCOIC Recon BDE Approval Unit briefs plan to JTF-N Unit accepts mission Platoon conducts PRECON

  5. Concept of the Operation Phase II - Execution Clearing & grubbing Cutting, filling & shaping sub-base Sub-base compaction Drainage ditch filter fabric & rip-rap

  6. Concept of the Operation Phase II - Execution Concrete low water crossing installation Final walkthrough & customer acceptance Spreading & shaping of base AAR & media coverage

  7. Progress Tracking

  8. BEFORE (29 JAN 10) AFTER (07 MAR 10)

  9. Counterinsurgency Training • Key Leader Engagement/Negotiation • USBP, USACE, LCC, Civilian Engineers, Concerned citizens (environmentalists), Contractors, media • Battle Space Owners, Civilian Construction companies, HN Military Engineers, HN Government, Contractors, USACE • Cultural Understanding • USBP-LS/LCC relationship, Drug Cartel in Mexico, Drug/Human trafficking • HN Military/Civilian relationships, Insurgent groups, International terrorism • EOF/ROE • SRUF – Posse Comitatus • ROE – HN Laws • Every Soldier a Sensor and Ambassador

  10. Questions?

  11. Questions?